Halizah, Nur (2022) Studi Kelayakan Pembangkit Listrik Tenaga Surya On-Grid di Lahan Parkir Gedung A Institut Teknologi Kalimantan-submit journal. Bachelor thesis, Institut Teknologi Kalimantan.
Text
04181066_cover.pdf Restricted to Repository staff only until 1 October 2023. Download (110kB) | Request a copy |
|
Text
04181066_abstract_en.pdf Restricted to Registered users only until 1 October 2023. Download (95kB) | Request a copy |
|
Text
04181066_abstract_id.pdf Restricted to Repository staff only until 1 October 2023. Download (97kB) | Request a copy |
|
Text
04181066_chapter_1.pdf Restricted to Registered users only until 1 October 2023. Download (148kB) | Request a copy |
|
Text
04181066_chapter_2.pdf Restricted to Registered users only until 1 October 2023. Download (481kB) | Request a copy |
|
Text
04181066_chapter_3.pdf Restricted to Registered users only until 1 October 2023. Download (302kB) | Request a copy |
|
Text
04181066_chapter_4.pdf Restricted to Registered users only until 1 October 2023. Download (837kB) | Request a copy |
|
Text
04181066_conclusions.pdf Restricted to Registered users only until 1 October 2023. Download (134kB) | Request a copy |
|
Text
04181066_bibliography.pdf Restricted to Registered users only until 1 October 2023. Download (116kB) | Request a copy |
|
Text
04181066_Lembar Persetujuan Publikasi Ilmiah (Form. TA-020).pdf Restricted to Repository staff only until 1 October 2023. Download (521kB) | Request a copy |
|
Text
04181066_paper.pdf Restricted to Repository staff only until 1 October 2023. Download (426kB) | Request a copy |
Abstract
Negara Indonesia merupakan negara tropis yang memiliki potensi energi surya sebesar 4,8 kWh/m2 /hari. Kalimantan memiliki total potensi energi surya sebesar 52.725 MW, sehingga menjadi lokasi pengembangan Pembangkit Listrik Tenaga Surya (PLTS) yang baik khususnya di lahan parkir Gedung A Kampus Institut Teknologi Kalimantan. Penelitian ini berfokus melakukan studi kelayakan PLTS yang bertujuan untuk menganalisis kelayakan PLTS di lahan parkir Gedung A ITK. Metode yang dilakukan yaitu analisis teknis dan ekonomis melalui teknik perhitungan manual dan simulasi menggunakan software PVsyst. Hasil perhitungan komponen diperoleh jumlah keseluruhan modul surya yang digunakan sebanyak 240 modul berkapasitas 450 Wp, dan 3 inverter berkapasitas 40 kW. Hasil analisis teknis melalui teknik perhitungan manual berdasarkan data pengukuran langsung diperoleh nilai performance ratio sebesar 73%, dan berdasarkan potensi energi NASA diperoleh nilai performance ratio sebesar 86%. Adapun hasil performance ratio melalui software PVsyst yang berdasarkan data potensi energi pengukuran langsung diperoleh nilai performance ratio sebesar 84%, dan berdasarkan potensi energi NASA diperoleh nilai performance ratio sebesar 83%. Berdasarkan hasil performance ratio tersebut, PLTS layak dibangun, karena diperoleh performance ratio PLTS di atas standar kelayakan yaitu 70%. Adapun hasil analisis ekonomi yaitu payback periode melalui teknik perhitungan manual berdasarkan cost of energy dari data potensi energi pengukuran langsung adalah selama 10 tahun, dan berdasarkan cost of energy rekening listrik ITK tahun 2022 selama 6,3 tahun. Berdasarkan cost of energy dari data potensi energi dari NASA adalah selama 10 tahun dan berdasarkan cost of energy rekening listrik ITK tahun 2022 selama 7,9 tahun. Perancangan PLTS ini didapatkan hasil yang layak dari segi ekonomis, karena diperoleh hasil payback periode kurang dari 25 tahun masa operasional PLTS
Item Type: | Thesis (Bachelor) |
---|---|
Subjects: | A General Works > AS Academies and learned societies (General) L Education > L Education (General) Q Science > Q Science (General) T Technology > T Technology (General) |
Divisions: | Jurusan Teknologi Industri dan Proses > Teknik Elektro |
Depositing User: | Nur Halizah |
Date Deposited: | 19 Jul 2022 07:58 |
Last Modified: | 19 Jul 2022 07:58 |
URI: | http://repository.itk.ac.id/id/eprint/18967 |
Actions (login required)
View Item |