Ilman, Muhammad and Andreosan, Steven Rezky (2023) Pra Rancangan Pabrik Polyaluminium Chloride dari Bauksit dengan Kapasitas 89.000 ton/tahun. Bachelor thesis, Institut Teknologi Kalimantan.
Text
05191046_05191072_cover.pdf Restricted to Repository staff only until 7 October 2025. Download (163kB) | Request a copy |
|
Text
05191946_05191072_statement_of_authenticity.pdf Restricted to Repository staff only until 7 October 2025. Download (270kB) | Request a copy |
|
Text
05191046_05191072_publishing_agreement.pdf Restricted to Repository staff only until 7 October 2025. Download (422kB) | Request a copy |
|
Text
05191046_05191072_approval_sheet.pdf Restricted to Repository staff only until 7 October 2025. Download (256kB) | Request a copy |
|
Text
05191046_05191072_preface.pdf Restricted to Repository staff only until 7 October 2025. Download (266kB) | Request a copy |
|
Text
05191046_05191072_abstract_id.pdf Restricted to Repository staff only until 7 October 2025. Download (284kB) | Request a copy |
|
Text
05191046_05191072_abstract_en.pdf Restricted to Repository staff only until 7 October 2025. Download (327kB) | Request a copy |
|
Text
05191046_05191072_table_of_content.pdf Restricted to Repository staff only until 7 October 2025. Download (382kB) | Request a copy |
|
Text
05191046_05191072_illustrations.pdf Restricted to Repository staff only until 7 October 2025. Download (279kB) | Request a copy |
|
Text
05191046_05191072_tables.pdf Restricted to Repository staff only until 7 October 2025. Download (356kB) | Request a copy |
|
Text
05191046_05191072_notations.pdf Restricted to Repository staff only until 7 October 2025. Download (334kB) | Request a copy |
|
Text
05191046_05191072_chapter_1.pdf Restricted to Repository staff only until 7 October 2025. Download (570kB) | Request a copy |
|
Text
05191046_05191072_chapter_2.pdf Restricted to Repository staff only until 7 October 2025. Download (418kB) | Request a copy |
|
Text
05191046_05191072_chapter_3.pdf Restricted to Repository staff only until 7 October 2025. Download (673kB) | Request a copy |
|
Text
05191046_05191072_chapter_4.pdf Restricted to Repository staff only until 7 October 2025. Download (869kB) | Request a copy |
|
Text
05191046_05191072_chapter_5.pdf Restricted to Repository staff only until 7 October 2025. Download (599kB) | Request a copy |
|
Text
05191046_05191072_chapter_6.pdf Restricted to Repository staff only until 7 October 2025. Download (536kB) | Request a copy |
|
Text
05191046_05191072_chapter_7.pdf Restricted to Repository staff only until 7 October 2025. Download (713kB) | Request a copy |
|
Text
05191046_05191072_chapter_8.pdf Restricted to Repository staff only until 7 October 2025. Download (360kB) | Request a copy |
|
Text
05191046_05191072_conclusions.pdf Restricted to Repository staff only until 7 October 2025. Download (287kB) | Request a copy |
|
Text
05191046_05191072_bibliography.pdf Restricted to Repository staff only until 7 October 2025. Download (295kB) | Request a copy |
|
Text
05191046_05191072_enclosure.pdf Restricted to Repository staff only until 7 October 2025. Download (1MB) | Request a copy |
|
Text
05191046_05191072_presentation.pdf Restricted to Repository staff only until 7 October 2025. Download (2MB) | Request a copy |
|
Text
05191046_05191072_Form. TA-020.pdf Restricted to Repository staff only until 7 October 2025. Download (231kB) | Request a copy |
Abstract
Produksi PAC (Polyaluminium Chloride) dari bauksit dengan kapasitas 89.000 ton/tahun terdiri dari 2 tahap proses utama. Tahapan pertama merupakan proses digesti bauksit dan NaOH dan tahapan yang kedua adalah mereaksikan aluminium hidroksida dengan HCl untuk menghasilkan PAC dalam bentuk liquid yang nantinya akan melalui proses spray drying hingga didapatkan PAC dalam bentuk powder. Pabrik PAC memiliki jumlah pekerja sebanyak 100 orang pekerja, dengan waktu operasional 24 jam perhari yang dibagi 3 shift dengan masing masing 8 jam kerja. Pabrik ini rencananya akan didirikan di Tayan, Kalimantan Barat dimana lokasi ini dipilih karena dekat dengan bahan baku utama yaitu bauksit. Pabrik PAC ini membutuhkan listrik sebesar 600 kW dan kebutuhan air sebesar 265.477,26 kg/jam. Adapun modal tetap (FCI) dan modal kerja (WCI) yang dibutuhkan dalam pembangunan pabrik ini secara berturut-turut sebesar Rp. 454.336.614.953,89.- dan Rp. 80.117.049.697,75.-, sehingga jumlah modal investasi (TCI) pabrik ini sebesar 545.088.876.682,29-. Berdasarkan aspek ekonomi nilai DCFR pabrik ini sebesar 24,6%, ROI sebesar 77% dan BEP sebesar 70%. Dari aspek tersebut dapat disimpulkan bahwa pabrik PAC ini layak dikaji lebih lanjut.
Item Type: | Thesis (Bachelor) |
---|---|
Subjects: | T Technology > TP Chemical technology |
Divisions: | Jurusan Teknologi Industri dan Proses > Teknik Kimia |
Depositing User: | Steven Rezky Andreosan |
Date Deposited: | 20 Jul 2023 07:55 |
Last Modified: | 20 Jul 2023 07:55 |
URI: | http://repository.itk.ac.id/id/eprint/20206 |
Actions (login required)
View Item |