Muhammad, Reza Pahlevi (2023) Pra Rancangan Pabrik Hidrogen Peroksida Melalui Proses Autooksidasi Ethyl Anthraquinone Dengan Kapasitas Produksi 50.000 Ton/Tahun. Bachelor thesis, Institut Teknologi Kalimantan.
Text
05191051_Cover.pdf Restricted to Repository staff only until 7 October 2025. Download (83kB) | Request a copy |
|
Text
05191051_Statement _of_Authenticity.pdf Restricted to Repository staff only until 7 October 2025. Download (146kB) | Request a copy |
|
Text
05191051_Approval Sheet (2).pdf Restricted to Repository staff only until 7 October 2025. Download (113kB) | Request a copy |
|
Text
05191051_Preface.pdf Restricted to Repository staff only until 8 October 2025. Download (111kB) | Request a copy |
|
Text
05191051_Publishing Aggrement.pdf Restricted to Repository staff only until 7 October 2025. Download (82kB) | Request a copy |
|
Text
05191051_Abstract_id.pdf Restricted to Repository staff only until 7 October 2025. Download (58kB) | Request a copy |
|
Text
05191051_Abstract_en.pdf Restricted to Repository staff only until 7 October 2025. Download (57kB) | Request a copy |
|
Text
05191051_Table_of_content.pdf Restricted to Repository staff only until 7 October 2025. Download (100kB) | Request a copy |
|
Text
05191051_Tables.pdf Restricted to Repository staff only until 7 October 2025. Download (84kB) | Request a copy |
|
Text
05191051_Illustrations.pdf Restricted to Repository staff only until 7 October 2025. Download (69kB) | Request a copy |
|
Text
05191051_Notations.pdf Restricted to Repository staff only until 7 October 2025. Download (334kB) | Request a copy |
|
Text
05191051_Chapter I.pdf Restricted to Repository staff only until 7 October 2025. Download (277kB) | Request a copy |
|
Text
05191051_Chapter II.pdf Restricted to Repository staff only until 7 October 2025. Download (243kB) | Request a copy |
|
Text
05191051_Chapter III.pdf Restricted to Repository staff only until 7 October 2025. Download (364kB) | Request a copy |
|
Text
05191051_Chapter IV.pdf Restricted to Repository staff only until 7 October 2025. Download (551kB) | Request a copy |
|
Text
05191051_Chapter V.pdf Restricted to Repository staff only until 7 October 2025. Download (1MB) | Request a copy |
|
Text
05191051_Chapter VI.pdf Restricted to Repository staff only until 7 October 2025. Download (1MB) | Request a copy |
|
Text
05191051_Chapter VII.pdf Restricted to Repository staff only until 7 October 2025. Download (1MB) | Request a copy |
|
Text
05191051_Chapter VIII.pdf Restricted to Repository staff only until 7 October 2025. Download (1MB) | Request a copy |
|
Text
05191051_Chapter IX.pdf Restricted to Repository staff only until 7 October 2025. Download (1MB) | Request a copy |
|
Text
05191051_Bibliography.pdf Restricted to Repository staff only until 7 October 2025. Download (1MB) | Request a copy |
|
Text
05191051_Enclosure.pdf Restricted to Repository staff only until 7 October 2025. Download (2MB) | Request a copy |
|
Text
05191051_Presentation.pdf Restricted to Repository staff only until 7 October 2025. Download (2MB) | Request a copy |
|
Text
05191051_Form TA 20.pdf Restricted to Repository staff only until 7 October 2025. Download (26kB) | Request a copy |
Abstract
Hidrogen peroksida adalah cairan tak berwarna yang mudah larut dalam air. Bahan kimia ini memiliki berbagai aplikasi, terutama sebagai bahan pemutih pada industri pulp dan kertas. Di Indonesia, kapasitas produksi pabrik hidrogen peroksida belum mencukupi kebutuhan dalam negeri, sehingga masih harus diimpor. Selain itu, permintaan hidrogen peroksida di seluruh dunia diperkirakan akan meningkat di tahun-tahun mendatang.Pada tahun 2023, direncanakan pembangunan pabrikhidrogen peroksida di Kawasan Industri Gresik, Kabupaten Gresik, Jawa Timur. Pabrik ini dijadwalkan beroperasi selama 330 hari per tahun dengan kapasitas produksi 50.000 ton per tahun. Lokasi pabrik dipilih berdasarkan pertimbangan bahan baku yaitu hidrogen yang akan disuplai oleh PT Petrokimia Gresik, serta tersedianya jalur transportasi dan infrastruktur yang memadai baik di darat maupun di perairan. Pabrik ini akan berdiri di atas lahan seluas 4,88 hektar dan akan dioperasikan oleh 10 operator per shift. Evaluasi ekonomi menunjukkan modal tetap sebesar $7.140.173,70 dan modal kerja sebesar $1.260.030,65. Pada kapasitas produksi penuh (100%), tingkat pengembalian investasi sebelum pajak adalah 124,31%. Payback period sebesar 2,53 tahun, dengan titik impas (BEP) 41,73%, surplus laba rugi.
Item Type: | Thesis (Bachelor) |
---|---|
Subjects: | T Technology > TP Chemical technology |
Divisions: | Jurusan Teknologi Industri dan Proses > Teknik Kimia |
Depositing User: | Muhammad Reza Pahlevi |
Date Deposited: | 26 Jul 2023 08:21 |
Last Modified: | 26 Jul 2023 08:21 |
URI: | http://repository.itk.ac.id/id/eprint/20322 |
Actions (login required)
View Item |