Pra Rancangan Pabrik Minyak Pelumas Dasar Dari Minyak Pelumas Bekas Dengan Proses Hidrotreating Kapasitas 10.000 Ton/Tahun.

Elman, Waruwu and Saleha, Saleha Shela (2023) Pra Rancangan Pabrik Minyak Pelumas Dasar Dari Minyak Pelumas Bekas Dengan Proses Hidrotreating Kapasitas 10.000 Ton/Tahun. Bachelor thesis, Institut Teknologi Kalimantan.

[img] Text
05191020_05191069_cover.pdf

Download (36kB)
[img] Text
05191020_05191069_statement_of_authenticity.pdf

Download (141kB)
[img] Text
05191020_05191069_publishing_agreement (1).pdf

Download (150kB)
[img] Text
05191020_05191069_approval_sheet.pdf

Download (516kB)
[img] Text
05191020_05191069_preface.pdf

Download (113kB)
[img] Text
05191020_05191069_abstract_id.pdf

Download (113kB)
[img] Text
05191020_05191069_abstract_en.pdf
Restricted to Repository staff only until 7 January 2025.

Download (111kB) | Request a copy
[img] Text
05191020_05191069_table_of_content.pdf
Restricted to Repository staff only until 7 January 2025.

Download (285kB) | Request a copy
[img] Text
05191020_05191069_illustrations.pdf
Restricted to Repository staff only until 7 January 2025.

Download (131kB) | Request a copy
[img] Text
05191020_05191069_tables.pdf
Restricted to Repository staff only until 7 January 2025.

Download (134kB) | Request a copy
[img] Text
05191020_05191069_notations.pdf
Restricted to Repository staff only until 7 January 2025.

Download (198kB) | Request a copy
[img] Text
05191020_05191069_chapter_1.pdf
Restricted to Repository staff only until 7 January 2025.

Download (366kB) | Request a copy
[img] Text
05191020_05191069_chapter_2.pdf
Restricted to Repository staff only until 7 January 2025.

Download (269kB) | Request a copy
[img] Text
05191020_05191069_chapter_3.pdf
Restricted to Repository staff only until 7 January 2025.

Download (345kB) | Request a copy
[img] Text
05191020_05191069_chapter_4.pdf
Restricted to Repository staff only until 7 January 2025.

Download (429kB) | Request a copy
[img] Text
05191020_05191069_chapter_5.pdf
Restricted to Repository staff only until 7 January 2025.

Download (191kB) | Request a copy
[img] Text
05191020_05191069_chapter_6.pdf
Restricted to Repository staff only until 7 January 2025.

Download (301kB) | Request a copy
[img] Text
05191020_05191069_chapter_7.pdf
Restricted to Repository staff only until 7 January 2025.

Download (307kB) | Request a copy
[img] Text
05191020_05191069_chapter_8.pdf
Restricted to Repository staff only until 7 January 2025.

Download (187kB) | Request a copy
[img] Text
05191020_05191069_conclusions.pdf
Restricted to Repository staff only until 7 January 2025.

Download (112kB) | Request a copy
[img] Text
05191020_05191069_bibliography.pdf

Download (176kB)
[img] Text
05191020_05191069_enclosure.pdf
Restricted to Repository staff only until 7 January 2025.

Download (1MB) | Request a copy
[img] Text
05191020_05191069_presentation.pdf
Restricted to Repository staff only until 7 January 2025.

Download (1MB) | Request a copy
[img] Text
05191020_05191069_Form. TA-020.pdf
Restricted to Repository staff only until 7 January 2025.

Download (38kB) | Request a copy

Abstract

Minyak pelumas terbuat dari minyak bumi mentah yang menjalani proses refinement, di sektor industri minyak pelumas sering digunakan untuk metal cutting, transfer panas, dan kegiatan terkait pelumasan lainnya. Minyak pelumas yang digunakan akan tercemar atau terdegradasi sebagai akibat dari proses pengaplikasian, selanjutnya minyak ini disebut sebagai minyak bekas (waste oil). Pra rancangan pabrik minyak pelumas dasar berbahan baku minyak pelumas bekas direncanakan memiliki kapasitas produksi sebesar 10.000 ton/tahun dan beroperasi selama 330 hari dalam setahun. Pabrik minyak pelumas dasar direncanakan untuk dibangun di wilayah Kelurahan Buluminung, Kecamatan Penajam, Kabupaten Penajam Paser Utara, Provinsi Kalimantan Timur, Indonesia. Dengan masa konstruksi selama 2 tahun dan beroperasi selama 20 tahun. Pabrik minyak pelumas dasar layak untuk dikaji lebih lanjut berdasarkan evaluasi ekonomi dengan rincian sebagai berikut. Total Capital Investment (TCI) : US$27.346.306, Total Production Cost (TPC) : US$29.787.726, Return on Investment (ROI) : 11%, Net Present Value (NPV) : US$135.625.378, Discounted Cash Flow Rate of Return (DCFR) : 57,62%, Discounted Payback Period (DPBP) : 2,2 tahun.

Item Type: Thesis (Bachelor)
Subjects: T Technology > T Technology (General)
T Technology > TP Chemical technology
Divisions: Jurusan Teknologi Industri dan Proses > Teknik Kimia
Depositing User: Shela Saleha Shela
Date Deposited: 26 Jul 2023 00:20
Last Modified: 26 Jul 2023 00:20
URI: http://repository.itk.ac.id/id/eprint/20473

Actions (login required)

View Item View Item