PENGARUH KONVERSI LCT MENJADI KMP TERHADAP KEBUTUHAN ENERGI LISTRIK PADA SISTEM PENERANGAN

Wijaya, Alfino Eka (2025) PENGARUH KONVERSI LCT MENJADI KMP TERHADAP KEBUTUHAN ENERGI LISTRIK PADA SISTEM PENERANGAN. Bachelor thesis, Institut Teknologi Kalimantan.

[img] Text
09201003_Cover.pdf

Download (374kB)
[img] Text
09201003_Statement_Of_Authenticity.pdf
Restricted to Repository staff only until 26 April 2027.

Download (249kB) | Request a copy
[img] Text
09201003_Publishing_Agreement.pdf
Restricted to Repository staff only until 26 April 2027.

Download (318kB) | Request a copy
[img] Text
09201003_Approval_Sheet.pdf
Restricted to Repository staff only until 26 April 2027.

Download (297kB) | Request a copy
[img] Text
09201003_Preface.pdf
Restricted to Repository staff only until 26 April 2027.

Download (607kB) | Request a copy
[img] Text
09201003_Abstrak_id.pdf
Restricted to Repository staff only until 26 April 2027.

Download (322kB) | Request a copy
[img] Text
09201003_Abstrak_en.pdf
Restricted to Repository staff only until 26 April 2027.

Download (156kB) | Request a copy
[img] Text
09201003_Table_of_content.pdf
Restricted to Repository staff only until 26 April 2027.

Download (626kB) | Request a copy
[img] Text
09201003_Illustrations.pdf
Restricted to Repository staff only until 26 April 2027.

Download (339kB) | Request a copy
[img] Text
09201003_Tables.pdf
Restricted to Repository staff only until 26 April 2027.

Download (339kB) | Request a copy
[img] Text
09201003_Notations.pdf
Restricted to Repository staff only until 26 April 2027.

Download (374kB) | Request a copy
[img] Text
09201003_Chapter_1.pdf
Restricted to Repository staff only until 26 April 2027.

Download (602kB) | Request a copy
[img] Text
09201003_Chapter_2.pdf
Restricted to Repository staff only until 26 April 2027.

Download (1MB) | Request a copy
[img] Text
09201003_Chapter_3.pdf
Restricted to Repository staff only until 26 April 2027.

Download (938kB) | Request a copy
[img] Text
09201003_Chapter_4.pdf
Restricted to Repository staff only until 26 April 2027.

Download (4MB) | Request a copy
[img] Text
09201003_Conclusions.pdf
Restricted to Repository staff only until 26 April 2027.

Download (319kB) | Request a copy
[img] Text
09201003_Bibliografi.pdf
Restricted to Repository staff only until 26 April 2027.

Download (658kB) | Request a copy
[img] Text
09201003_Enclosure.pdf
Restricted to Repository staff only until 26 April 2027.

Download (3MB) | Request a copy
[img] Text
09201003_Paper.pdf
Restricted to Repository staff only until 26 April 2027.

Download (2MB) | Request a copy
[img] Text
09201003_presentation.pdf
Restricted to Repository staff only until 26 April 2027.

Download (1MB) | Request a copy
[img] Text
09201003_From. TA-020.pdf
Restricted to Repository staff only until 26 April 2027.

Download (345kB) | Request a copy

Abstract

Perhitungan kebutuhan energi listrik pada kapal cukup penting, pada penelitian kali ini membahas tentang perhitungan Juntion Lightning pada kapal konversi, Kapal yang telah mengalami konversi atau perubahan jenis kapal contohnya dari kasus yang di ambil konversi dari LCT (Landing Craft Tank) menjadi KMP (Kapal Motor Penyeberangan). Dengan demikian konversi tersebut dapat merubah kebutuhan daya generator pada sistem penerangan dan desain sistem kelistrikan yang cukup signifikan, yang mana kebutuhan energi listrik akan mengalami kenaikan yang cukup besar terutama dalam hal peningkatan beban daya akibat perubahan sistem kelistrikan dan tambahan ruangan maupun peralatan pada kapal yang telah di konversikan tersebut. Dari hasil penelitian dan perhitungan, diketahui penggunaan kebututuhan energi listrik sistem penerangan pada kapal yang telah dikonversi memiliki total daya sebesar 24,8 Kw dibandingkan sebelum di konversi yang hanya 10,17 Kw, peningkatan daya tersebut meliputi daya dari lampu LED, AC, stop kontak, dan lampu emergency. Pada bagian penempatan titik peningkatan paling banyak yaitu lampu total terdapat 283 lampu dibanding kapal sebelumnya yang hanya 83 lampu dan wiring diagram terjadi perubahan pada deck 2 dikarenakan penambahan komponen yang cukup banyak maka dilakukan pembagian 2 JL (Junction Lightning), JL 2 A dan JL 2 B.

Item Type: Thesis (Bachelor)
Subjects: V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering
Divisions: Jurusan Sains, Teknologi Pangan, dan Kemaritiman > Teknik Perkapalan
Depositing User: Alfino Alfino Eka Wijaya Wijaya
Date Deposited: 13 Jan 2025 08:05
Last Modified: 13 Jan 2025 08:05
URI: http://repository.itk.ac.id/id/eprint/22222

Actions (login required)

View Item View Item