Tesy, Nylma and Arini, Zulmilafatma Nurlita (2025) PRA- RANCANGAN PABRIK SORBITOL BERBAHAN BAKU GLUKOSA MELALUI PROSES HIDROGENASI KATALITIK. Bachelor thesis, Institut Teknologi Kalimantan.
Text
05201094_preface.pdf Restricted to Repository staff only until 26 August 2027. Download (434kB) | Request a copy |
|
Text
05201094_abstract_id.pdf Restricted to Repository staff only until 26 August 2027. Download (445kB) | Request a copy |
|
Text
05201094_abstract_en.pdf Restricted to Repository staff only until 26 August 2027. Download (447kB) | Request a copy |
|
Text
05201094_table_of_content.pdf Restricted to Repository staff only until 26 August 2027. Download (1MB) | Request a copy |
|
Text
05201094_Ilustration.pdf Restricted to Repository staff only until 26 August 2027. Download (423kB) | Request a copy |
|
Text
05201094_tables.pdf Restricted to Repository staff only until 26 August 2027. Download (795kB) | Request a copy |
|
Text
05201094_notations.pdf Restricted to Repository staff only until 26 August 2027. Download (427kB) | Request a copy |
|
Text
05201094_chapter_1.pdf Restricted to Repository staff only until 26 August 2027. Download (9MB) | Request a copy |
|
Text
05201094_chapter_2.pdf Restricted to Repository staff only until 26 August 2027. Download (2MB) | Request a copy |
|
Text
05201094_chapter_3.pdf Restricted to Repository staff only until 26 August 2027. Download (1MB) | Request a copy |
|
Text
05201094_chapter_4.pdf Restricted to Repository staff only until 26 August 2027. Download (4MB) | Request a copy |
|
Text
05201094_chapter_5.pdf Restricted to Repository staff only until 26 August 2027. Download (2MB) | Request a copy |
|
Text
05201094_chapter_6.pdf Restricted to Repository staff only until 26 August 2027. Download (2MB) | Request a copy |
|
Text
05201094_chapter_7.pdf Restricted to Repository staff only until 26 August 2027. Download (2MB) | Request a copy |
|
Text
05201094_chapter_8.pdf Restricted to Repository staff only until 26 August 2027. Download (679kB) | Request a copy |
|
Text
05201094_Biblioghraphy.pdf Restricted to Repository staff only until 26 August 2027. Download (547kB) | Request a copy |
|
Text
05201094_enclosure.pdf Restricted to Repository staff only until 26 August 2027. Download (1MB) | Request a copy |
|
Text
05201094_conclusions.pdf Restricted to Repository staff only until 26 August 2027. Download (249kB) | Request a copy |
|
Text
05201094_Cover.pdf Restricted to Repository staff only until 26 August 2027. Download (73kB) | Request a copy |
|
Text
05201094_statement_of_authenticity.pdf Restricted to Repository staff only until 26 August 2027. Download (128kB) | Request a copy |
|
Text
05201094_publishing_agreement.pdf Restricted to Registered users only until 26 August 2027. Download (119kB) | Request a copy |
|
Text
05201094_approval_sheet.pdf Restricted to Repository staff only until 26 August 2027. Download (104kB) | Request a copy |
|
Text
05201094_presentation.pdf Restricted to Repository staff only until 26 August 2027. Download (944kB) | Request a copy |
Abstract
Pabrik sorbitol akan didirikan sebagai bentuk dukungan terhadap rencana Pembangunan Industri Provinsi Jawa Tengah. Produksi sorbitol dari glukosa dan hidrogen melalui proses hidrogenasi katalitik dengan kapasitas 55.000 ton/tahun, terdiri dari 3 tahapan proses, yaitu tahap pre-treatment, tahap reaksi, dan tahap pemurnian produk. Tahap pre-treatment dilakukan untuk menyesuaikan kondisi operasi glukosa dan hidrogen. Selanjutnya, mereaksikan glukosa dengan hidrogen pada trickle bed reactor. Kemudian, dilakukan tahap pemurnian dengan evaporator untuk mendapatkan sorbitol dengan konsentrasi 70%. Pabrik sorbitol memiliki jumlah pekerja sebanyak 102 pekerja dengan waktu operasional 24 jam dalam waktu 330 hari dengan pembagian jam kerja menjadi 3 shift selama 8 jam/shift. Pabrik ini direncanakan akan didirikan di Kendal, Jawa Tengah dengan luas tanah sebesar 14.000 m2. Pabrik sorbitol ini membutuhkan listrik sebesar 134,226 kW/jam dan kebutuhan air sebesar 52.472,55 kg/jam. Adapun modal tetap (FCI) dan modal kerja (WCI) yang dibutuhkan dalam pembangunan pabrik ini adalah sebesar $.10.960.014,90 dan $.1.934.120,28 dengan jumlah modal investasi (TCI) dari pabrik ini sebesar $.12.894.135,17. Aspek ekonomi terukur dari pabrik ini adalah nilai DCFR sebesar 56%, nilai ROI sebesar 73%, dan BEP sebesar 25%. Berdasarkan aspek-aspek yang telah disebutkan, dapat disimpulkan bahwa pabrik sorbitol ini layak untuk dikaji lebih lanjut. Kata Kunci : Hidrogenasi katalitik, Glukosa, Kendal, Sorbitol
Item Type: | Thesis (Bachelor) |
---|---|
Subjects: | Q Science > QC Physics Q Science > QD Chemistry T Technology > TP Chemical technology |
Divisions: | Jurusan Teknologi Industri dan Proses > Teknik Kimia |
Depositing User: | Zulmilafatma Arini |
Date Deposited: | 16 Jan 2025 01:21 |
Last Modified: | 16 Jan 2025 01:21 |
URI: | http://repository.itk.ac.id/id/eprint/22430 |
Actions (login required)
View Item |