EVALUASI PENERAPAN GREEN BUILDING PADA GEDUNG RUMAH SAKIT HERMINA IBU KOTA NUSANTARA DENGAN METODE PENILAIAN GREENSHIP GBCI dan PERMEN PUPR NO. 21 TAHUN 2021 -Submit Jurnal

Putri, Dhima Surya (2025) EVALUASI PENERAPAN GREEN BUILDING PADA GEDUNG RUMAH SAKIT HERMINA IBU KOTA NUSANTARA DENGAN METODE PENILAIAN GREENSHIP GBCI dan PERMEN PUPR NO. 21 TAHUN 2021 -Submit Jurnal. Bachelor thesis, Institut Teknologi Kalimantan.

[img] Text
07211020_cover.pdf
Restricted to Repository staff only until 4 October 2027.

Download (243kB) | Request a copy
[img] Text
07211020_cover.pdf
Restricted to Repository staff only until 4 October 2027.

Download (243kB) | Request a copy
[img] Text
07211020_cover.pdf

Download (243kB)
[img] Text
07211020_abstract_en.pdf
Restricted to Repository staff only until 4 October 2027.

Download (303kB) | Request a copy
[img] Text
07211020_cover.pdf
Restricted to Repository staff only until 4 October 2027.

Download (243kB) | Request a copy
[img] Text
07211020_abstract_id.pdf
Restricted to Repository staff only until 4 October 2027.

Download (303kB) | Request a copy
[img] Text
07211020_approval_sheet.pdf
Restricted to Repository staff only until 4 October 2027.

Download (93kB) | Request a copy
[img] Text
07211020_bibliography..pdf
Restricted to Repository staff only until 4 October 2027.

Download (269kB) | Request a copy
[img] Text
07211020_chapter_1.pdf
Restricted to Repository staff only until 4 October 2027.

Download (639kB) | Request a copy
[img] Text
07211020_chapter_3..pdf
Restricted to Repository staff only until 4 October 2027.

Download (560kB) | Request a copy
[img] Text
07211020_chapter_4..pdf
Restricted to Repository staff only until 4 October 2027.

Download (4MB) | Request a copy
[img] Text
07211020_chapter_2.pdf
Restricted to Repository staff only until 4 October 2027.

Download (481kB) | Request a copy
[img] Text
07211020_conclusions.pdf
Restricted to Repository staff only until 4 October 2027.

Download (299kB) | Request a copy
[img] Text
07211020_Form.TA-020.pdf

Download (137kB)
[img] Text
07211020_enclosure..pdf
Restricted to Repository staff only until 4 October 2027.

Download (4MB) | Request a copy
[img] Text
07211020_illustrations.pdf
Restricted to Repository staff only until 4 October 2027.

Download (292kB) | Request a copy
[img] Text
07211020_notations.pdf
Restricted to Repository staff only until 4 October 2027.

Download (191kB) | Request a copy
[img] Text
07211020_preface.pdf
Restricted to Repository staff only until 4 October 2027.

Download (350kB) | Request a copy
[img] Text
07211020_publishing_agreement.pdf
Restricted to Repository staff only until 4 October 2027.

Download (308kB) | Request a copy
[img] Text
07211020_statement_of_authenticity.pdf
Restricted to Repository staff only until 4 October 2027.

Download (199kB) | Request a copy
[img] Text
07211020_table_of_content.pdf
Restricted to Repository staff only until 4 October 2027.

Download (299kB) | Request a copy
[img] Text
07211020_tables.pdf
Restricted to Repository staff only until 4 October 2027.

Download (292kB) | Request a copy
[img] Text
07211020_Paper.pdf
Restricted to Repository staff only until 4 October 2027.

Download (346kB) | Request a copy
[img] Image
07211020_Form. TA-020..jpg

Download (184kB)
[img] Text
07211020_Form.TA-020.pdf
Restricted to Repository staff only until 4 October 2027.

Download (137kB) | Request a copy
[img] Text
07211020_presentation.pdf
Restricted to Repository staff only

Download (4MB) | Request a copy

Abstract

Pembangunan infrastruktur di Indonesia, terutama dalam menghadapi pemindahan Ibu Kota Negara ke Kalimantan Timur, menghadirkan tantangan lingkungan yang signifikan, seperti kerusakan ekosistem dan peningkatan emisi karbon. Krisis energi dan dampak perubahan iklim mendorong kebutuhan akan konsep pembangunan berkelanjutan, salah satunya melalui penerapan green building. Rumah Sakit Hermina Ibu Kota Nusantara, meskipun dibangun dengan pendekatan smart dan eco-green, masih menghadapi beberapa kendala dalam implementasi prinsip bangunan hijau, seperti tingginya konsumsi energi, dominasi pencahayaan buatan, serta belum optimalnya pemanfaatan energi terbarukan dan pengelolaan sumber daya. Penelitian ini bertujuan mengevaluasi penerapan green building pada Rumah Sakit Hermina IKN menggunakan dua metode penilaian, yaitu Greenship New Building versi 1.2 dari Green Building Council Indonesia (GBCI) dan Peraturan Menteri PUPR No. 21 Tahun 2021. Penilaian dilakukan melalui observasi lapangan, studi dokumen, dan validasi oleh tenaga ahli bersertifikat Greenship Profesional. Hasil evaluasi menunjukkan bahwa gedung memperoleh 59 dari 101 poin (58,41%) berdasarkan Greenship dengan predikat Gold, dan 120 dari 165 poin (72,73%) berdasarkan Permen PUPR dengan predikat Madya. Beberapa indikator belum terpenuhi, terutama pada aspek efisiensi energi, konservasi air, kenyamanan dalam ruang, serta pengelolaan limbah dan material. Rekomendasi yang disusun mencakup penyusunan simulasi energi dan neraca air, pemasangan submeter, sensor lingkungan, penambahan vegetasi bertajuk lebar, serta pencatatan volume limbah secara berkala. Implementasi rekomendasi ini diharapkan dapat meningkatkan nilai capaian green building serta mendukung arah pembangunan berkelanjutan di sektor fasilitas kesehatan, khususnya di kawasan Ibu Kota Nusantara. Kata Kunci: Evaluasi Bangunan Gedung, Green building, Greenship versi 1.2, Rumah Sakit, Ibu Kota Nusantara

Item Type: Thesis (Bachelor)
Subjects: A General Works > AI Indexes (General)
Divisions: Jurusan Teknik Sipil dan Perencanaan > Teknik Sipil
Depositing User: Dhima Surya Putri
Date Deposited: 10 Jul 2025 00:38
Last Modified: 10 Jul 2025 00:38
URI: http://repository.itk.ac.id/id/eprint/22890

Actions (login required)

View Item View Item