Evaluasi Penjadwalan Fabrikasi Winch Kapal Menggunakan CPM dan PERT (Studi Kasus: PT. Wichindo Pratama)

Fadli, Muhammad (2025) Evaluasi Penjadwalan Fabrikasi Winch Kapal Menggunakan CPM dan PERT (Studi Kasus: PT. Wichindo Pratama). Bachelor thesis, Institut Teknologi Kalimantan.

[img] Text
12211057_cover.pdf
Restricted to Repository staff only until 4 October 2027.

Download (102kB) | Request a copy
[img] Text
12211057_statement_of_authenticity.pdf
Restricted to Repository staff only until 4 October 2027.

Download (85kB) | Request a copy
[img] Text
12211057_publishing_agreement.pdf
Restricted to Repository staff only until 4 October 2027.

Download (87kB) | Request a copy
[img] Text
12211057_approval_sheet.pdf
Restricted to Repository staff only until 4 October 2027.

Download (83kB) | Request a copy
[img] Text
12211057_preface.pdf
Restricted to Repository staff only until 4 October 2027.

Download (70kB) | Request a copy
[img] Text
12211057_abstract_id.pdf
Restricted to Repository staff only until 4 October 2027.

Download (84kB) | Request a copy
[img] Text
12211057_abstract_en.pdf
Restricted to Repository staff only until 4 October 2027.

Download (84kB) | Request a copy
[img] Text
12211057_table_of_content.pdf
Restricted to Repository staff only until 4 October 2027.

Download (72kB) | Request a copy
[img] Text
12211057_illustrations.pdf
Restricted to Repository staff only until 4 October 2027.

Download (61kB) | Request a copy
[img] Text
12211057_tables.pdf
Restricted to Repository staff only until 4 October 2027.

Download (61kB) | Request a copy
[img] Text
12211057_notations.pdf
Restricted to Repository staff only until 4 October 2027.

Download (18kB) | Request a copy
[img] Text
12211057_chapter_1.pdf
Restricted to Repository staff only until 4 October 2027.

Download (323kB) | Request a copy
[img] Text
12211057_chapter_2.pdf
Restricted to Repository staff only until 4 October 2027.

Download (379kB) | Request a copy
[img] Text
12211057_chapter_3.pdf
Restricted to Repository staff only until 4 October 2027.

Download (156kB) | Request a copy
[img] Text
12211057_chapter_4.pdf
Restricted to Repository staff only until 4 October 2027.

Download (1MB) | Request a copy
[img] Text
12211057_conclusions.pdf
Restricted to Repository staff only until 4 October 2027.

Download (22kB) | Request a copy
[img] Text
12211057_bibliography.pdf
Restricted to Repository staff only until 4 October 2027.

Download (158kB) | Request a copy
[img] Text
12211057_enclosure.pdf
Restricted to Repository staff only until 4 October 2027.

Download (424kB) | Request a copy
[img] Text
12211057_paper.pdf
Restricted to Repository staff only until 4 October 2027.

Download (452kB) | Request a copy
[img] Text
12211057_presentation.pdf
Restricted to Repository staff only until 4 October 2027.

Download (2MB) | Request a copy
[img] Text
12211057_Form. TA-020.pdf
Restricted to Repository staff only until 4 October 2027.

Download (433kB) | Request a copy

Abstract

Indonesia sebagai negara maritim memiliki potensi besar dalam industri kelautan, termasuk fabrikasi winch kapal. PT. Wichindo Pratama menghadapi kendala dalam penjadwalan proyek, seperti keterlambatan pengadaan material dan gangguan mesin, yang berdampak pada keterlambatan produksi. Penelitian ini bertujuan untuk mengevaluasi penjadwalan proyek fabrikasi winch kapal menggunakan metode Critical Path Method (CPM) dan Program Evaluation and Review Technique (PERT). CPM digunakan untuk mengidentifikasi jalur kritis proyek, sementara PERT mempertimbangkan ketidakpastian waktu penyelesaian setiap aktivitas. Hasil penelitian menunjukkan bahwa jalur kritis terdiri dari 25 aktivitas, yaitu A1–A2–A3–B1–B2–B3–B6–B7–C1–C2–D1–G3–G4–H1–H2–H3–H4–I3–I4–I5–J1–J2–J3–K1–K2, dengan total durasi 315 jam atau setara 40 hari kerja. Risiko keterlambatan paling tinggi terdapat pada aktivitas pengadaan material dan proses machining. Melalui penerapan kedua metode, durasi proyek semula 513 jam dapat dipangkas menjadi 449 jam melalui percepatan 17 aktivitas, dengan tambahan biaya sebesar Rp5.323.125. Kombinasi CPM dan PERT terbukti membantu mempercepat penyelesaian proyek dan mengontrol biaya. Metode ini dapat digunakan sebagai alat bantu yang efektif dalam perencanaan dan pengendalian proyek, sehingga meningkatkan efisiensi serta mendukung kelancaran produksi.

Item Type: Thesis (Bachelor)
Subjects: T Technology > T Technology (General)
Divisions: Jurusan Teknologi Industri dan Proses > Teknik Industri
Depositing User: Muhammad Fadli
Date Deposited: 08 Jul 2025 07:17
Last Modified: 08 Jul 2025 07:17
URI: http://repository.itk.ac.id/id/eprint/23167

Actions (login required)

View Item View Item