Hutajulu, Ester Marsella Novita and Laurina, Reza (2025) PRA-RANCANGAN PABRIK MONONITROTOLUENA DARI TOLUENA DAN ASAM NITRAT BERKATALIS ASAM SULFAT DENGAN PROSES NITRASI. Bachelor thesis, Institut Teknologi Kalimantan.
![]() |
Text
05211029_05211070_cover.pdf Restricted to Repository staff only until 4 January 2027. Download (202kB) | Request a copy |
![]() |
Text
05211029_05211070_statement_of_authenticity.pdf Restricted to Repository staff only until 4 January 2027. Download (5MB) | Request a copy |
![]() |
Text
05211029_05211070_publishing_agreement.pdf Restricted to Repository staff only until 4 January 2027. Download (5MB) | Request a copy |
![]() |
Text
05211029_05211070_approval_sheet.pdf Restricted to Repository staff only until 4 January 2027. Download (4MB) | Request a copy |
![]() |
Text
05211029_05211070_preface.pdf Restricted to Repository staff only until 4 January 2027. Download (363kB) | Request a copy |
![]() |
Text
05211029_05211070_abstract_id.pdf Restricted to Repository staff only until 4 January 2027. Download (408kB) | Request a copy |
![]() |
Text
05211029_05211070_abstract_en.pdf Restricted to Repository staff only until 4 January 2027. Download (461kB) | Request a copy |
![]() |
Text
05211029_05211070_table_of_content.pdf Restricted to Repository staff only until 4 January 2027. Download (613kB) | Request a copy |
![]() |
Text
05211029_05211070_illustrations.pdf Restricted to Repository staff only until 4 January 2027. Download (476kB) | Request a copy |
![]() |
Text
05211029_05211070_tables.pdf Restricted to Repository staff only until 4 January 2027. Download (548kB) | Request a copy |
![]() |
Text
05211029_05211070_notations.pdf Restricted to Repository staff only until 4 January 2027. Download (538kB) | Request a copy |
![]() |
Text
05211029_05211070_chapter_1.pdf Restricted to Repository staff only until 4 January 2027. Download (932kB) | Request a copy |
![]() |
Text
05211029_05211070_chapter_2.pdf Restricted to Repository staff only until 4 January 2027. Download (1MB) | Request a copy |
![]() |
Text
05211029_05211070_chapter_3.pdf Restricted to Repository staff only until 4 January 2027. Download (825kB) | Request a copy |
![]() |
Text
05211029_05211070_chapter_4.pdf Restricted to Repository staff only until 4 January 2027. Download (1MB) | Request a copy |
![]() |
Text
05211029_05211070_chapter_5.pdf Restricted to Repository staff only until 4 January 2027. Download (1MB) | Request a copy |
![]() |
Text
05211029_05211070_chapter_6.pdf Restricted to Repository staff only until 4 January 2027. Download (1MB) | Request a copy |
![]() |
Text
05211029_05211070_chapter_7.pdf Restricted to Repository staff only until 4 January 2027. Download (1MB) | Request a copy |
![]() |
Text
05211029_05211070_chapter_8.pdf Restricted to Repository staff only until 4 January 2027. Download (901kB) | Request a copy |
![]() |
Text
05211029_05211070_conclusions.pdf Restricted to Repository staff only until 4 January 2027. Download (449kB) | Request a copy |
![]() |
Text
05211029_05211070_bibliography.pdf Restricted to Repository staff only until 4 January 2027. Download (575kB) | Request a copy |
![]() |
Text
05211029_05211070_enclosure.pdf Restricted to Repository staff only until 4 January 2027. Download (3MB) | Request a copy |
![]() |
Text
05211029_05211070_paper.pdf Restricted to Repository staff only until 4 January 2027. Download (351kB) | Request a copy |
![]() |
Text
05211029_05211070_presentation.pdf Restricted to Repository staff only until 4 January 2027. Download (1MB) | Request a copy |
![]() |
Text
05211029_05211070_Form. TA-020.pdf Restricted to Repository staff only until 4 January 2027. Download (4MB) | Request a copy |
Abstract
Pra-rancangan pabrik mononitrotoluena (MNT) dilakukan untuk memenuhi kebutuhan domestik dan ekspor sebagai bahan baku industri cat, dengan kapasitas produksi 25.000 ton/tahun. Proses produksi dilakukan melalui reaksi nitrasi toluena dengan asam nitrat dan asam sulfat sebagai katalis, menggunakan reaktor alir tangki berpengaduk (CSTR) pada suhu 50°C dan tekanan 1 atm, menghasilkan produk dengan kemurnian 99%. Pabrik beroperasi kontinyu 24 jam/hari selama 330 hari/tahun, dan direncanakan dibangun di Kawasan Industri Tuban (KIT), Jawa Timur di atas lahan seluas 8 ha. Dalam operasionalnya, pabrik membutuhkan listrik sebesar 122,35 kW serta air domestik dan sanitasi sebesar 385,15 kg/jam. Energi panas disuplai oleh LNG untuk boiler, sementara cadangan listrik menggunakan diesel oil untuk generator. Secara ekonomi, pabrik memerlukan Fixed Capital Investment (FCI) sebesar $12.646.107,59 dan Working Capital Investment (WCI) sebesar $1.896.916,14, menghasilkan Total Capital Investment (TCI) sebesar $14.543.023,73. Berdasarkan analisis kelayakan menggunakan Discounted Cash Flow Rate (DCFR), proyek menunjukkan Return on Investment (ROI) sebesar 93.51%, dengan Discounted Payback Period (DPBP) selama 1 tahun 3 bulan, serta Break Even Point (BEP) tercapai pada 66% kapasitas produksi. Nilai DCFR sebesar 52.43% menegaskan bahwa proyek ini sangat layak secara ekonomi.
Item Type: | Thesis (Bachelor) |
---|---|
Subjects: | T Technology > TP Chemical technology |
Divisions: | Jurusan Teknologi Industri dan Proses > Teknik Kimia |
Depositing User: | Reza Laurina |
Date Deposited: | 14 Jul 2025 00:26 |
Last Modified: | 14 Jul 2025 00:26 |
URI: | http://repository.itk.ac.id/id/eprint/24376 |
Actions (login required)
![]() |
View Item |