Pra - Rancangan Pabrik Asetonitril dari Amonia dan Asam Asetat dengan Metode Amonolisis Asam Asetat

Bila, Ade Zhalsa and Salsabila, Anisah Nazifa (2025) Pra - Rancangan Pabrik Asetonitril dari Amonia dan Asam Asetat dengan Metode Amonolisis Asam Asetat. Bachelor thesis, Institut Teknologi Kalimantan.

[img] Text
05211001_05211009_cover.pdf
Restricted to Repository staff only until 4 January 2027.

Download (197kB) | Request a copy
[img] Text
05211001_05211009_statement_of_authenticity.pdf
Restricted to Repository staff only until 4 January 2027.

Download (476kB) | Request a copy
[img] Text
05211001_05211009_publishing_agreement.pdf
Restricted to Repository staff only until 4 January 2027.

Download (476kB) | Request a copy
[img] Text
05211001_05211009_approval_sheet.pdf
Restricted to Repository staff only until 4 January 2027.

Download (473kB) | Request a copy
[img] Text
05211001_05211009_preface .pdf
Restricted to Repository staff only until 4 January 2027.

Download (343kB) | Request a copy
[img] Text
05211001_05211009_abstract_id .pdf
Restricted to Repository staff only until 4 January 2027.

Download (393kB) | Request a copy
[img] Text
05211001_05211009_abstract_en .pdf
Restricted to Repository staff only until 4 January 2027.

Download (441kB) | Request a copy
[img] Text
05211001_05211009_table_of_content .pdf
Restricted to Repository staff only until 4 January 2027.

Download (573kB) | Request a copy
[img] Text
05211001_05211009_illustrations .pdf
Restricted to Repository staff only until 4 January 2027.

Download (373kB) | Request a copy
[img] Text
05211001_05211009_tables.pdf
Restricted to Repository staff only until 4 January 2027.

Download (453kB) | Request a copy
[img] Text
05211001_05211009_notations.pdf
Restricted to Repository staff only until 4 January 2027.

Download (403kB) | Request a copy
[img] Text
05211001_05211009_chapter_1 .pdf
Restricted to Repository staff only until 4 January 2027.

Download (814kB) | Request a copy
[img] Text
05211001_05211009_chapter_2 .pdf
Restricted to Repository staff only until 4 January 2027.

Download (626kB) | Request a copy
[img] Text
05211001_05211009_chapter_3.pdf
Restricted to Repository staff only until 4 January 2027.

Download (1MB) | Request a copy
[img] Text
05211001_05211009_chapter_4.pdf
Restricted to Repository staff only until 4 January 2027.

Download (1MB) | Request a copy
[img] Text
05211001_05211009_chapter_5.pdf
Restricted to Repository staff only until 4 January 2027.

Download (679kB) | Request a copy
[img] Text
05211001_05211009_chapter_6.pdf
Restricted to Repository staff only until 4 January 2027.

Download (741kB) | Request a copy
[img] Text
05211001_05211009_chapter_7.pdf
Restricted to Repository staff only until 4 January 2027.

Download (1MB) | Request a copy
[img] Text
05211001_05211009_chapter_8.pdf
Restricted to Repository staff only until 4 January 2027.

Download (538kB) | Request a copy
[img] Text
05211001_05211009_conclusions.pdf
Restricted to Repository staff only until 4 January 2027.

Download (328kB) | Request a copy
[img] Text
05211001_05211009_bibliography.pdf
Restricted to Repository staff only until 4 January 2027.

Download (335kB) | Request a copy
[img] Text
05211001_05211009_enclosure.pdf
Restricted to Repository staff only until 4 January 2027.

Download (1MB) | Request a copy
[img] Text
05211001_05211009_paper.pdf
Restricted to Repository staff only until 4 January 2027.

Download (413kB) | Request a copy
[img] Text
05211001_05211009_presentation.pdf
Restricted to Repository staff only until 4 January 2027.

Download (4MB) | Request a copy
[img] Text
05211001_05211009_Form. TA-020.pdf
Restricted to Repository staff only until 4 January 2027.

Download (143kB) | Request a copy

Abstract

Pabrik asetonitril akan didirikan sebagai bentuk dukungan terhadap Rencana Pembangunan Jangka Menengah Nasional (RPJMN) yang menargetkan Indonesia sebagai pusat produksi farmasi di Asia Tenggara pada tahun 2030. Produksi asetonitril dari amonia dan asam asetat melalui proses amonlisis asam asetat dengan kapasitas 13,000 ton/tahun, terdiri dari 13 tahapan proses, yaitu tahap pre-treatment, tahap reaksi, dan tahap pemurnian produk. Tahap pre-treatment dilakukan untuk menyesuaikan kondisi operasi asam asetat dan amonia. Selanjutnya, mereaksikan asam asetat dan amonia pada reaktor fixed bed multitube. Kemudian, dilakukan tahap pemurnian menggunakan ekstraktor dan distilasi untuk mendapatkan asetonitril dengan kemurnian 99%. Pabrik asetonitril memiliki jumlah pekerja sebanyak 220 pekerja, beroperasi selama 24 jam dan 330 hari dengan pembagian jam kerja menjadi 3 shift selama 8 jam /shift. Pabrik ini direncanakan akan didirikan di Gresik, Jawa Timur, dengan luas tanah sebesar 17 ha. Pabrik asetonitril ini membutuhkan listrik sebesar 254,18 kW/jam dan kebutuhan air sebesar 132 m3/hari. Adapun modal tetap (FCI) dan modal kerja (WCI) yang dibutuhkan dalam pembangunan pabrik ini adalah sebesar Rp 601,182,119,398,36. dan Rp 90,177,317,909,75. dengan jumlah modal investasi (TCI) dari pabrik ini sebesar Rp 691,359,437,308,12. Aspek ekonomi terukur dari pabrik ini adalah nilai DCFR sebesar 42,89%, nilai ROI sebesar 76%, dan BEP sebesar 71,9%. Berdasarkan aspek-aspek yang telah disebutkan, dapat disimpulkan bahwa pabrik asetonitril ini layak untuk dikaji lebih lanjut.

Item Type: Thesis (Bachelor)
Subjects: T Technology > TP Chemical technology
Divisions: Jurusan Teknologi Industri dan Proses > Teknik Kimia
Depositing User: Anisah Nazifa Salsabila
Date Deposited: 11 Jul 2025 06:47
Last Modified: 11 Jul 2025 06:47
URI: http://repository.itk.ac.id/id/eprint/24382

Actions (login required)

View Item View Item