REDESIGN PENERAPAN GREEN DESIGN DENGAN MENGGUNAKAN STANDART GREEN BUILDING COUNCIL INDONESIA (GBCI) PADA GEDUNG B KAMPUS INSTITUT TEKNOLOGI KALIMANTAN

Dwiramadhan, Reyhan Ranu (2026) REDESIGN PENERAPAN GREEN DESIGN DENGAN MENGGUNAKAN STANDART GREEN BUILDING COUNCIL INDONESIA (GBCI) PADA GEDUNG B KAMPUS INSTITUT TEKNOLOGI KALIMANTAN. Bachelor thesis, Institut Teknologi Kalimantan.

[img] Text
07201069_Cover.pdf
Restricted to Registered users only until 25 April 2028.

Download (339kB) | Request a copy
[img] Text
07201069_Statement_of_authenticity.pdf
Restricted to Registered users only until 25 April 2028.

Download (280kB) | Request a copy
[img] Text
07201069_publishing_agreement .pdf
Restricted to Registered users only until 25 April 2028.

Download (518kB) | Request a copy
[img] Text
07201069_approval_sheet.pdf
Restricted to Registered users only until 25 April 2028.

Download (145kB) | Request a copy
[img] Text
07201069_Preface .pdf
Restricted to Registered users only until 25 April 2028.

Download (541kB) | Request a copy
[img] Text
07201069_abstract_id .pdf
Restricted to Registered users only until 25 April 2028.

Download (612kB) | Request a copy
[img] Text
07201069_abstract_en .pdf
Restricted to Repository staff only until 25 April 2028.

Download (604kB) | Request a copy
[img] Text
07201069_table_of_content.pdf
Restricted to Repository staff only until 25 April 2028.

Download (1MB) | Request a copy
[img] Text
07201069_illustrations.pdf
Restricted to Repository staff only until 25 April 2028.

Download (345kB) | Request a copy
[img] Text
07201069_Tables.pdf
Restricted to Repository staff only until 25 April 2028.

Download (654kB) | Request a copy
[img] Text
07201069_notations .pdf
Restricted to Repository staff only until 25 April 2028.

Download (359kB) | Request a copy
[img] Text
07201069_Chapter_1.pdf
Restricted to Repository staff only until 25 April 2028.

Download (4MB) | Request a copy
[img] Text
07201069_Chapter_2.pdf
Restricted to Repository staff only until 25 April 2028.

Download (4MB) | Request a copy
[img] Text
07201069_Chapter_3.pdf
Restricted to Repository staff only until 25 April 2028.

Download (3MB) | Request a copy
[img] Text
07201069_Chapter_4 .pdf
Restricted to Repository staff only until 25 April 2028.

Download (4MB) | Request a copy
[img] Text
07201069_Conclusions.pdf
Restricted to Repository staff only until 25 April 2028.

Download (1MB) | Request a copy
[img] Text
07201069_bibliograpy.pdf
Restricted to Registered users only until 25 April 2028.

Download (1MB) | Request a copy
[img] Text
07201069_enclosure.pdf
Restricted to Repository staff only until 25 April 2028.

Download (4MB) | Request a copy
[img] Text
07201069_paper.pdf
Restricted to Repository staff only until 25 April 2028.

Download (1MB) | Request a copy
[img] Text
07201069_Presentation.pdf
Restricted to Repository staff only until 25 April 2028.

Download (3MB) | Request a copy
[img] Text
07201069_Form TA-020.pdf
Restricted to Repository staff only until 25 April 2028.

Download (795kB) | Request a copy

Abstract

Gedung B Institut Teknologi Kalimantan (ITK) berdiri sejak tahun 2013 dan menjadi salah satu fasilitas penting dalam mendukung aktivitas akademik maupun administratif di kampus. Namun, setelah berusia 12 tahun, gedung ini mengalami penurunan kualitas struktural dan fungsional yang berdampak pada kenyamanan serta efisiensi penggunaannya. Selain itu, Gedung B hingga kini belum menerapkan konsep Eco Campus, yaitu pendekatan kampus ramah lingkungan yang bertujuan mewujudkan lingkungan hijau, berkelanjutan, serta memberikan edukasi mengenai pengelolaan lingkungan. Oleh karena itu, diperlukan upaya redesign Gedung B dengan menerapkan prinsip green building guna menciptakan bangunan yang lebih ramah lingkungan, hemat energi, dan berkelanjutan. Penelitian ini bertujuan mengevaluasi desain ulang Gedung B berdasarkan prinsip green building. Metode yang digunakan meliputi analisis pemodelan desain dan gambar kerja hasil redesign, yang kemudian dievaluasi berdasarkan kriteria green building, meliputi efisiensi energi, penggunaan material ramah lingkungan, serta pengelolaan air dan limbah. Hasil penelitian menunjukkan bahwa setelah dilakukan redesign, perolehan nilai mencapai 42,74 poin dengan persentase 36,53%. Angka ini meningkat sebesar 22,84 poin atau 19,52% dibandingkan hasil penelitian sebelumnya yang hanya memperoleh 19,90 poin dengan persentase 17,01%. Secara keseluruhan, hasil tersebut menunjukkan bahwa desain ulang Gedung B berhasil memenuhi aspek keberlanjutan dan kinerja lingkungan bangunan dengan capaian predikat Bronze pada Green Building, yaitu dengan persentase di atas 35% dan nilai minimum 41 poin.

Item Type: Thesis (Bachelor)
Subjects: N Fine Arts > NA Architecture
N Fine Arts > NC Drawing Design Illustration
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Jurusan Teknik Sipil dan Perencanaan > Teknik Sipil
Depositing User: Reyhan Ranu Dwiramadhan
Date Deposited: 06 Jan 2026 05:29
Last Modified: 06 Jan 2026 05:29
URI: http://repository.itk.ac.id/id/eprint/24845

Actions (login required)

View Item View Item