Rante, Renaldy and Fadillah, Muhammad Rafly (2026) PRA-RANCANGAN PABRIK LOGAM TIMBAL (REFINED LEAD) DARI BIJIH GALENA DENGAN PROSES PIROMETALURGI. Bachelor thesis, Institut Teknologi Kalimantan.
|
Text
05221051_05221074_cover.pdf Download (439kB) |
|
|
Text
05221051_05221074_statement_of_authenticity.pdf Download (461kB) |
|
|
Text
05221051_05221074_publishing_agreement.pdf Download (485kB) |
|
|
Text
05221051_05221074_approval_sheet.pdf Download (549kB) |
|
|
Text
05221051_05221074_preface.pdf Download (555kB) |
|
|
Text
05221051_05221074_abstract_id.pdf Download (393kB) |
|
|
Text
05221051_05221074_abstract_en.pdf Restricted to Repository staff only until 3 January 2028. Download (431kB) | Request a copy |
|
|
Text
05221051_05221074_table_of_content.pdf Restricted to Repository staff only until 3 January 2028. Download (735kB) | Request a copy |
|
|
Text
05221051_05221074_illustrations.pdf Restricted to Repository staff only until 3 January 2028. Download (402kB) | Request a copy |
|
|
Text
05221051_05221074_tables.pdf Restricted to Repository staff only until 3 January 2028. Download (605kB) | Request a copy |
|
|
Text
05221051_05221074_notations.pdf Restricted to Repository staff only until 3 January 2028. Download (512kB) | Request a copy |
|
|
Text
05221051_05221074_chapter_1.pdf Restricted to Repository staff only until 3 January 2028. Download (1MB) | Request a copy |
|
|
Text
05221051_05221074_chapter_2.pdf Restricted to Repository staff only until 3 January 2028. Download (1MB) | Request a copy |
|
|
Text
05221051_05221074_chapter_3.pdf Restricted to Repository staff only until 3 January 2028. Download (796kB) | Request a copy |
|
|
Text
05221051_05221074_chapter_4.pdf Restricted to Repository staff only until 3 January 2028. Download (1MB) | Request a copy |
|
|
Text
05221051_05221074_chapter_5.pdf Restricted to Repository staff only until 3 January 2028. Download (675kB) | Request a copy |
|
|
Text
05221051_05221074_chapter_6.pdf Restricted to Repository staff only until 3 January 2028. Download (999kB) | Request a copy |
|
|
Text
05221051_05221074_chapter_7.pdf Restricted to Repository staff only until 3 January 2028. Download (1MB) | Request a copy |
|
|
Text
05221051_05221074_chapter_8.pdf Restricted to Repository staff only until 3 January 2028. Download (399kB) | Request a copy |
|
|
Text
05221051_05221074_conclusions.pdf Restricted to Repository staff only until 3 January 2028. Download (268kB) | Request a copy |
|
|
Text
05221051_05221074_bibliography.pdf Download (288kB) |
|
|
Text
05221051_05221074_enclosure.pdf Restricted to Repository staff only until 3 January 2028. Download (2MB) | Request a copy |
|
|
Text
05221051_05221074_paper.pdf Restricted to Repository staff only until 3 January 2028. Download (322kB) | Request a copy |
|
|
Text
05221051_05221074_presentation.pdf Restricted to Repository staff only until 3 January 2028. Download (3MB) | Request a copy |
Abstract
Pra-rancangan pabrik refined lead dari bijih galena melalui proses pirometalurgi bertujuan untuk memenuhi kebutuhan refined lead dalam negeri dan kebutuhan ekspor negara-negara Asia Tenggara yaitu Singapura, Thailand dan Malaysia. Pabrik ini direncanakan beroperasi pada tahun 2031 di Kawasan Industri Kuala Tanjung, Kabupaten Batu Bara, Sumatera Utara dengan luas lahan 119.200 m² dan kapasitas produksi 125.000 ton/tahun. Umur pabrik dirancang selama 16 tahun dengan masa konstruksi selama 3 tahun. Proses produksi terdiri dari tahap persiapan bahan baku, peleburan menggunakan KIVCET furnace, tahap pemurnian lead bullion dan tahap produksi produk samping H2SO4. Untuk mendukung kegiatan operasional selama 330 hari/tahun, pabrik ini membutuhkan 170 tenaga kerja, pasokan listrik sebesar 5.015,816 kW, kebutuhan air sanitasi 144.358,34 kg/jam, air pendingin 1,272,689.12 kg/jam, dan air umpan boiler 189.050,369 kg/jam. Dengan kapasitas tersebut, modal tetap (FCI) dan modal kerja (WCI) yang dibutuhkan untuk pembangunan pabrik ini adalah sebesar Rp. 900.110.563.006,34 dan Rp. 158.843.040.530,53 dengan jumlah biaya investasi total (TCI) sebesar Rp. 1.058.953.603.536,87. Melalui analisis kelayakan ekonomi, diperoleh nilai Discounted Cash Flow Rate (DCFR) sebesar 51,79%, laju pengembalian modal (ROI) sebesar 94,9%, dan titik impas (BEP) sebesar 56,6%. Berdasarkan aspek-aspek yang telah disebutkan, dapat disimpulkan bahwa pabrik refined lead ini layak untuk dikaji lebih lanjut.
| Item Type: | Thesis (Bachelor) |
|---|---|
| Subjects: | T Technology > TN Mining engineering. Metallurgy |
| Divisions: | Jurusan Teknologi Industri dan Proses > Teknik Kimia |
| Depositing User: | Renaldy Rante |
| Date Deposited: | 17 Jul 2026 06:19 |
| Last Modified: | 17 Jul 2026 06:19 |
| URI: | http://repository.itk.ac.id/id/eprint/27572 |
Actions (login required)
![]() |
View Item |
