Bahtiar, Josi Masjaya Rachmad and Aulia, Rosmitha Syanla (2026) Pra-Rancangan Pabrik Etilbenzena dari Benzena dan Etilena Menggunakan Proses Lummus Crest dengan Kapasitas 53.000 Ton/Tahun. Bachelor thesis, Institut Teknologi Kalimantan.
|
Text
05221005_05221059_cover.pdf Restricted to Repository staff only until 7 January 2028. Download (338kB) | Request a copy |
|
|
Text
05221005_05221059_publishing_agreement.pdf Restricted to Repository staff only until 7 January 2028. Download (299kB) | Request a copy |
|
|
Text
05221005_05221059_approval_sheet.pdf Restricted to Repository staff only until 7 January 2028. Download (47kB) | Request a copy |
|
|
Text
05221005_05221059_preface.pdf Restricted to Repository staff only until 7 January 2028. Download (246kB) | Request a copy |
|
|
Text
05221005_05221059_abstract_id.pdf Restricted to Repository staff only until 7 January 2028. Download (251kB) | Request a copy |
|
|
Text
05221005_05221059_abstract_en.pdf Restricted to Repository staff only until 7 January 2028. Download (281kB) | Request a copy |
|
|
Text
05221005_05221059_table_of_content.pdf Restricted to Repository staff only until 7 January 2028. Download (942kB) | Request a copy |
|
|
Text
05221005_05221059_illustrations.pdf Restricted to Repository staff only until 7 January 2028. Download (231kB) | Request a copy |
|
|
Text
05221005_05221059_tables.pdf Restricted to Repository staff only until 7 January 2028. Download (676kB) | Request a copy |
|
|
Text
05221005_05221059_notations.pdf Restricted to Repository staff only until 7 January 2028. Download (287kB) | Request a copy |
|
|
Text
05221005_05221059_chapter_1.pdf Restricted to Repository staff only until 7 January 2028. Download (3MB) | Request a copy |
|
|
Text
05221005_05221059_chapter_2.pdf Restricted to Repository staff only until 7 January 2028. Download (1MB) | Request a copy |
|
|
Text
05221005_05221059_chapter_3.pdf Restricted to Repository staff only until 7 January 2028. Download (1MB) | Request a copy |
|
|
Text
05221005_05221059_chapter_4.pdf Restricted to Repository staff only until 7 January 2028. Download (2MB) | Request a copy |
|
|
Text
05221005_05221059_chapter_5.pdf Restricted to Repository staff only until 7 January 2028. Download (2MB) | Request a copy |
|
|
Text
05221005_05221059_chapter_6.pdf Restricted to Repository staff only until 7 January 2028. Download (1MB) | Request a copy |
|
|
Text
05221005_05221059_chapter_7.pdf Restricted to Repository staff only until 7 January 2028. Download (5MB) | Request a copy |
|
|
Text
05221005_05221059_chapter_8.pdf Restricted to Repository staff only until 7 January 2028. Download (1MB) | Request a copy |
|
|
Text
05221005_05221059_conclusions.pdf Restricted to Repository staff only until 7 January 2028. Download (223kB) | Request a copy |
|
|
Text
05221005_05221059_bibliography.pdf Restricted to Repository staff only until 7 January 2028. Download (463kB) | Request a copy |
|
|
Text
05221005_05221059_enclosure.pdf Restricted to Repository staff only until 7 January 2028. Download (1MB) | Request a copy |
|
|
Text
05221005_05221059_paper.pdf Restricted to Repository staff only until 7 January 2028. Download (272kB) | Request a copy |
|
|
Text
05221005_05221059_presentation.pdf Restricted to Repository staff only until 7 January 2028. Download (2MB) | Request a copy |
|
|
Text
05221005_05221059_statement_of_authenticity.pdf Restricted to Repository staff only until 7 January 2028. Download (35kB) | Request a copy |
Abstract
Pra-rancangan pabrik etilbenzena (C₈H₁₀) direncanakan dengan kapasitas produksi sebesar 53.000 ton/tahun dan beroperasi secara kontinyu selama 330 hari per tahun. Pabrik akan berlokasi di Krakatau Industrial Estate Cilegon (KIEC), Banten, yang dipilih berdasarkan ketersediaan bahan baku, kemudahan akses transportasi, ketersediaan utilitas, dan kedekatan dengan pasar. Bahan baku utama yang digunakan adalah benzena dan etilena yang direaksikan melalui proses alkilasi menggunakan teknologi Lummus Crest Process dengan katalis Zeolit Y dalam reaktor trickle bed pada kondisi operasi sekitar 250°C dan 38 bar. Produk hasil reaksi kemudian dimurnikan melalui rangkaian unit pemisahan hingga diperoleh etilbenzena dengan kemurnian tinggi. Untuk menunjang operasional pabrik, digunakan berbagai fasilitas utilitas yang meliputi unit pengolahan air, sistem penyediaan steam, cooling water, listrik, refrigerant, Therminol VP-1 sebagai media pemanas, serta unit pengolahan limbah. Berdasarkan hasil evaluasi ekonomi, pabrik ini memerlukan Total Capital Investment(TCI) sebesar Rp101,911 miliar dan menunjukkan parameter kelayakan ekonomi yang baik dengan Return on Investment (ROI) sebesar 94,38%, Break Even Point (BEP) sebesar 55,37%, dan Discounted PayBack Period (DPBP) sebesar 0,327 tahun. Hasil tersebut menunjukkan bahwa pabrik etilbenzena yang dirancang layak untuk didirikan dan dikembangkan baik dari aspek teknis maupun ekonomi. Kata Kunci: Etilbenzena, Alkilasi Benzena, Proses Lummus Crest, Zeolit Y, Reaktor Trickle Bed
| Item Type: | Thesis (Bachelor) |
|---|---|
| Subjects: | T Technology > TP Chemical technology |
| Divisions: | Jurusan Teknologi Industri dan Proses > Teknik Kimia |
| Depositing User: | Josi Masjaya Rachmad Bahtiar |
| Date Deposited: | 17 Jul 2026 05:57 |
| Last Modified: | 17 Jul 2026 05:57 |
| URI: | http://repository.itk.ac.id/id/eprint/27604 |
Actions (login required)
![]() |
View Item |
