Pra-Rancangan Pabrik Tetrahydrofuran Dari 1,4 Butanediol Dengan Proses Dehidrasi Katalitik

Setiawan, Muhammad Riski and Ismail, Muhammad Fauzan (2026) Pra-Rancangan Pabrik Tetrahydrofuran Dari 1,4 Butanediol Dengan Proses Dehidrasi Katalitik. Bachelor thesis, Institut Teknologi Kalimantan.

[img] Text
05221017_05221080_cover.pdf

Download (316kB)
[img] Text
05221017_05221080_statement_of_authenticity.pdf

Download (268kB)
[img] Text
05221017_05221080_publishing_agreement.pdf

Download (230kB)
[img] Text
05221017_05221080_approval_sheet.pdf

Download (53kB)
[img] Text
05221017_05221080_preface.pdf

Download (201kB)
[img] Text
05221017_05221080_abstract_id.pdf

Download (210kB)
[img] Text
05221017_05221080_abstract_en.pdf
Restricted to Repository staff only until 3 January 2028.

Download (246kB) | Request a copy
[img] Text
05221017_05221080_table_of_content.pdf
Restricted to Repository staff only until 3 January 2028.

Download (243kB) | Request a copy
[img] Text
05221017_05221080_illustrations.pdf
Restricted to Repository staff only until 3 January 2028.

Download (232kB) | Request a copy
[img] Text
05221017_05221080_tables.pdf
Restricted to Repository staff only until 3 January 2028.

Download (216kB) | Request a copy
[img] Text
05221017_05221080_notations.pdf
Restricted to Repository staff only until 3 January 2028.

Download (205kB) | Request a copy
[img] Text
05221017_05221080_chapter_1.pdf
Restricted to Repository staff only until 3 January 2028.

Download (741kB) | Request a copy
[img] Text
05221017_05221080_chapter_2.pdf
Restricted to Repository staff only until 3 January 2028.

Download (447kB) | Request a copy
[img] Text
05221017_05221080_chapter_3.pdf
Restricted to Repository staff only until 3 January 2028.

Download (459kB) | Request a copy
[img] Text
05221017_05221080_chapter_4.pdf
Restricted to Repository staff only until 3 January 2028.

Download (480kB) | Request a copy
[img] Text
05221017_05221080_chapter_5.pdf
Restricted to Repository staff only until 3 January 2028.

Download (474kB) | Request a copy
[img] Text
05221017_05221080_chapter_6.pdf
Restricted to Repository staff only until 3 January 2028.

Download (462kB) | Request a copy
[img] Text
05221017_05221080_chapter_7.pdf
Restricted to Repository staff only until 3 January 2028.

Download (569kB) | Request a copy
[img] Text
05221017_05221080_chapter_8.pdf
Restricted to Repository staff only until 3 January 2028.

Download (321kB) | Request a copy
[img] Text
05221017_05221080_conclusions.pdf
Restricted to Repository staff only until 3 January 2028.

Download (235kB) | Request a copy
[img] Text
05221017_05221080_bibliography.pdf

Download (234kB)
[img] Text
05221017_05221080_enclosure.pdf
Restricted to Repository staff only until 3 January 2028.

Download (1MB) | Request a copy
[img] Text
05221017_05221080_paper.pdf
Restricted to Repository staff only until 3 January 2028.

Download (289kB) | Request a copy
[img] Text
05221017_05221080_presentation.pdf
Restricted to Repository staff only until 3 January 2028.

Download (1MB) | Request a copy

Abstract

Tetrahydrofuran (THF) merupakan senyawa eter siklik yang banyak digunakan sebagai pelarut dalam industri kimia, farmasi, dan polimer, terutama sebagai bahan baku polytetramethylene ether glycol (PTMEG). Pra-rancangan pabrik ini bertujuan merancang produksi THF dari 1,4-butanediol melalui reaksi dehidrasi menggunakan katalis zeolit ZSM-5. Pabrik dirancang berkapasitas 25.000 ton/tahun dengan waktu operasi 330 hari/tahun dan 24 jam/hari. Proses produksi meliputi persiapan bahan baku, reaksi dehidrasi dalam Continuous Stirred Tank Reactor (CSTR) pada suhu 150°C dan tekanan 20 atm dengan konversi 93,8%, serta tahap pemisahan dan pemurnian menggunakan centrifuge, rotary dryer, dan kolom distilasi sehingga diperoleh produk THF dengan kemurnian 99%. Hasil analisis ekonomi menunjukkan Total Capital Investment (TCI) sebesar US$43.705.672,01, Total Production Cost (TPC) sebesar US$32.822.486/tahun, Net Present Value (NPV) sebesar US$322.670.630, Discounted Cash Flow Rate of Return (DCFRR) sebesar 65,69%, Return on Investment (ROI) sebesar 60%, Discounted Payback Period (DPBP) selama 1,059 tahun, Break Even Point (BEP) sebesar 55%, dan Shutdown Point (SDP) sebesar 37%. Berdasarkan hasil tersebut, pra-rancangan pabrik THF dengan kemurnian produk 99% dinyatakan layak untuk direalisasikan karena memenuhi aspek teknis dan ekonomi.

Item Type: Thesis (Bachelor)
Subjects: T Technology > T Technology (General)
T Technology > TP Chemical technology
Divisions: Jurusan Teknologi Industri dan Proses > Teknik Kimia
Depositing User: Muhammad Riski Setiawan
Date Deposited: 20 Jul 2026 01:39
Last Modified: 20 Jul 2026 01:39
URI: http://repository.itk.ac.id/id/eprint/27814

Actions (login required)

View Item View Item