Jenrychk Marcelino, Tandi Karrang (2021) ANALYSIS OF POTENTIAL INSTALLATION OF SOLAR POWER PLANT ( PLTS ) AS LAND USE ON THE ROOFTOP OF BANK BNI OFFICE BUILDING BALIKPAPAN PERMAI. Bachelor thesis, Institut Teknologi Kalimantan.
Text
04161034_abstract_en.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
||
|
Text
04161034_abstract_id.pdf Download (1MB) | Preview |
|
|
Text
04161034_bibliography.pdf Download (1MB) | Preview |
|
|
Text
04161034_conclusions.pdf Download (3MB) | Preview |
|
Text
04161034_illustration.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
||
Text
04161034_notations.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
||
Text
04161034_preface.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
||
Text
04161034_publishing_agreement.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
||
Text
04161034_steatment_of_authenticity.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
||
Text
04161034_tables.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
||
Text
04161034_table_of_cotent.pdf Restricted to Repository staff only Download (3MB) | Request a copy |
||
|
Text
04161034_cover.pdf Download (1MB) | Preview |
|
Text
04161034_approval_sheet.pdf Restricted to Repository staff only Download (2MB) | Request a copy |
||
Text
04161034_Form.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
||
Text
04161034_presentation.pdf Restricted to Repository staff only Download (694kB) | Request a copy |
||
Text
04161034_chapter_4.pdf Restricted to Repository staff only Download (398kB) | Request a copy |
||
|
Text
04161034_chapter_2 .pdf Download (373kB) | Preview |
|
Text
04161034_enclosure .pdf Restricted to Repository staff only Download (443kB) | Request a copy |
||
Text
04161034_chapter_3.pdf Restricted to Repository staff only Download (7MB) | Request a copy |
||
|
Text
04161034_chapter_1.pdf Download (5MB) | Preview |
|
|
Text
04161034_cover.pdf Download (209kB) | Preview |
Abstract
In order to increase the application of renewable energy, the installation of Solar Power Plants (PLTS) in high-rise buildings is popular in Indonesia. In order to provide maximum benefits, plts installation must pay attention to the potential of the power generated and the appropriate components. This final task intends to analyze the potential installation of plts system on the rooftop of BNI office building located in Balikpapan Permai. This location is taken because of the high place so it is possible to be able to get sunlight energy without anything blocking or for example such a tall building. The design of plts in BNI Building has a total solar panel output power of 9.84 kW. The panel capacity used is 410 Wp with a total panel of 24 pieces, 1 inverter and 28 batteries used as power backup. The results of the design of PLTS in BNI Balikpapan Permai Bank building proved to have good potential so that it can be realized even in changing weather conditions. Plts system has a greater total power than the total power consumption in BNI Bank Building with a power consumption of 33 kW, while for the plts system in November obtained power of 50,784kW and power generated in December of 45,696 kW. So bni office will get a power surplus of 12,696 kW – 17,784 kW. Keywords : Energy, Solar, Photovoltaic, PLTS
Item Type: | Thesis (Bachelor) |
---|---|
Subjects: | A General Works > AC Collections. Series. Collected works A General Works > AS Academies and learned societies (General) |
Divisions: | Jurusan Teknologi Industri dan Proses > Teknik Elektro |
Depositing User: | Jenrychk Marcelino Tandi Karrang |
Date Deposited: | 30 Jul 2021 07:42 |
Last Modified: | 03 Aug 2021 07:23 |
URI: | http://repository.itk.ac.id/id/eprint/4134 |
Actions (login required)
View Item |