Muhammad Ilham, Ilham (2026) Analisis Tingkat Kerusakan dan Estimasi Biaya Pemeliharaan dan Perawatan Pada Bangunan Gedung SMK Ibnu Khaldun. Bachelor thesis, Insititut Teknologi Kalimantan.
|
Text
07211054_Cover.pdf Restricted to Repository staff only until 4 January 2028. Download (303kB) | Request a copy |
|
|
Text
07211054_statement_of_authenticity.pdf Restricted to Repository staff only until 4 January 2028. Download (1MB) | Request a copy |
|
|
Text
07211054_publishing_agreement.pdf Restricted to Repository staff only until 4 January 2028. Download (1MB) | Request a copy |
|
|
Text
07211054_approval_sheet.pdf Restricted to Repository staff only until 4 January 2028. Download (1MB) | Request a copy |
|
|
Text
07211054_preface.pdf Restricted to Repository staff only until 4 January 2028. Download (123kB) | Request a copy |
|
|
Text
07211054_abstract_id.pdf Restricted to Repository staff only until 4 January 2028. Download (166kB) | Request a copy |
|
|
Text
07211054_abstract_en.pdf Restricted to Repository staff only until 4 January 2028. Download (162kB) | Request a copy |
|
|
Text
07211054_table_of_content.pdf Restricted to Repository staff only until 4 January 2028. Download (230kB) | Request a copy |
|
|
Text
07211054_illustrations.pdf Restricted to Repository staff only until 4 January 2028. Download (147kB) | Request a copy |
|
|
Text
07211054_tables.pdf Restricted to Repository staff only until 4 January 2028. Download (175kB) | Request a copy |
|
|
Text
07211054_notations.pdf Restricted to Repository staff only until 4 January 2028. Download (129kB) | Request a copy |
|
|
Text
07211054_chapter_1.pdf Restricted to Repository staff only until 4 January 2028. Download (1MB) | Request a copy |
|
|
Text
07211054_chapter_2.pdf Restricted to Repository staff only until 4 January 2028. Download (4MB) | Request a copy |
|
|
Text
07211054_chapter_3.pdf Restricted to Repository staff only until 4 January 2028. Download (807kB) | Request a copy |
|
|
Text
07211054_chapter_4.pdf Restricted to Repository staff only until 4 January 2028. Download (5MB) | Request a copy |
|
|
Text
07211054_conclusions.pdf Restricted to Repository staff only until 4 January 2028. Download (170kB) | Request a copy |
|
|
Text
07211054_bibliography.pdf Restricted to Repository staff only until 4 January 2028. Download (175kB) | Request a copy |
|
|
Text
07211054_enclosure.pdf Restricted to Repository staff only until 4 January 2028. Download (4MB) | Request a copy |
|
|
Text
07211054_paper.pdf Restricted to Repository staff only until 4 January 2028. Download (701kB) | Request a copy |
|
|
Text
07211054_paper.pdf Restricted to Repository staff only until 4 January 2028. Download (701kB) | Request a copy |
|
|
Text
07211054_presentations..pdf Restricted to Repository staff only until 4 January 2028. Download (4MB) | Request a copy |
Abstract
School buildings require continuous maintenance and upkeep to ensure their functionality, safety, and comfort in supporting educational activities. Due to limited financial resources, schools need to establish maintenance priorities to ensure that available funds are allocated effectively. This study aims to identify the level of building deterioration and appropriate repair methods, determine maintenance priorities using the Analytical Hierarchy Process (AHP), and estimate maintenance and repair costs for the buildings of SMK Ibnu Khaldun Balikpapan. The research was conducted through field observations and questionnaire surveys involving 26 respondents who were familiar with the building conditions. The collected data were tested for validity and reliability before being analyzed using the AHP and Approximate Estimate methods. The results indicate that Building 1, Building 2, Building 3, and Building 4 are classified as having minor deterioration, with maintenance cost percentages of 1,00%, 0,99%, 1,00%, and 0,95%, respectively. The recommended repair methods include cleaning, repainting, repairing, and replacing damaged building components. The AHP analysis revealed that the architectural component is the highest maintenance priority among all building components. The total repair cost was estimated at IDR 63.244.606,24, while the total maintenance cost amounted to IDR 216.452.825,28 in one year. By considering inflation through the Approximate Estimate method, the projected maintenance cost over the next five years is estimated at IDR 229.007.089,15.
| Item Type: | Thesis (Bachelor) |
|---|---|
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Jurusan Teknik Sipil dan Perencanaan > Teknik Sipil |
| Depositing User: | Muhammad Muhammad Ilham Ilham |
| Date Deposited: | 20 Jul 2026 01:36 |
| Last Modified: | 20 Jul 2026 01:36 |
| URI: | http://repository.itk.ac.id/id/eprint/27849 |
Actions (login required)
![]() |
View Item |
