Fadila, Gardinna Safa and Sari, Sabila Ayu Purnama (2023) Pra-Rancangan Pabrik Liquefied Petroleum Gas (LPG) Dengan Bahan Baku Aspal Buton Kapasitas 155.000 Ton/Tahun. Bachelor thesis, Institut Teknologi Kalimantan.
Text
05191030_05191064_cover.pdf Restricted to Repository staff only until 7 January 2025. Download (13kB) | Request a copy |
|
Text
05191030_05191064_statement_of_authenticity.pdf Restricted to Repository staff only until 7 January 2025. Download (264kB) | Request a copy |
|
Text
05191030_05191064_publishing_agreement.pdf Restricted to Repository staff only until 7 January 2025. Download (292kB) | Request a copy |
|
Text
05191030_05191064_approval_sheet.pdf Restricted to Repository staff only until 7 January 2025. Download (258kB) | Request a copy |
|
Text
05191030_05191064_preface.pdf Restricted to Repository staff only until 7 January 2025. Download (206kB) | Request a copy |
|
Text
05191030_05191064_abstract_id.pdf Restricted to Repository staff only until 7 January 2025. Download (87kB) | Request a copy |
|
Text
05191030_05191064_abstract_en.pdf Restricted to Repository staff only until 7 January 2025. Download (86kB) | Request a copy |
|
Text
05191030_05191064_table_of_content.pdf Restricted to Repository staff only until 7 January 2025. Download (92kB) | Request a copy |
|
Text
05191030_05191064_illustrations.pdf Restricted to Repository staff only until 7 January 2025. Download (175kB) | Request a copy |
|
Text
05191030_05191064_tables.pdf Restricted to Repository staff only until 7 January 2025. Download (170kB) | Request a copy |
|
Text
05191030_05191064_notations.pdf Restricted to Repository staff only until 7 January 2025. Download (153kB) | Request a copy |
|
Text
05191030_05191064_chapter_1.pdf Restricted to Repository staff only until 7 January 2025. Download (316kB) | Request a copy |
|
Text
05191030_05191064_chapter_2.pdf Restricted to Repository staff only until 7 January 2025. Download (234kB) | Request a copy |
|
Text
05191030_05191064_chapter_3.pdf Restricted to Repository staff only until 7 January 2025. Download (311kB) | Request a copy |
|
Text
05191030_05191064_chapter_4.pdf Restricted to Repository staff only until 7 January 2025. Download (527kB) | Request a copy |
|
Text
05191030_05191064_chapter_5.pdf Restricted to Repository staff only until 7 January 2025. Download (264kB) | Request a copy |
|
Text
05191030_05191064_chapter_6.pdf Restricted to Repository staff only until 7 January 2025. Download (227kB) | Request a copy |
|
Text
05191030_05191064_chapter_7.pdf Restricted to Repository staff only until 7 January 2025. Download (317kB) | Request a copy |
|
Text
05191030_05191064_chapter_8.pdf Restricted to Repository staff only until 7 January 2025. Download (177kB) | Request a copy |
|
Text
05191030_05191064_conclusions.pdf Restricted to Repository staff only until 7 January 2025. Download (84kB) | Request a copy |
|
Text
05191030_05191064_bibliography.pdf Restricted to Repository staff only until 7 January 2025. Download (230kB) | Request a copy |
|
Text
05191030_05191064_enclosure.pdf Restricted to Repository staff only until 7 January 2025. Download (890kB) | Request a copy |
|
Text
05191030_05191064_presentation.pdf Restricted to Repository staff only until 7 January 2025. Download (1MB) | Request a copy |
|
Text
05191030_05191064_Form. TA-020.pdf Restricted to Repository staff only until 7 January 2025. Download (232kB) | Request a copy |
Abstract
Produksi LPG (Liquefied Petroleum Gas) berbahan baku aspal buton dengan kapasitas 155.000 ton/tahun akan didirikan di Luwuk, Sulawesi Tengah. Bahan baku aspal buton berupa fasa padat akan diperoleh dari PT. Wika Bitumen. Pabrik akan dirancang beroperasi secara kontinyu. Dalam menghasilkan produksi LPG terdiri dari tiga tahapan proses, yaitu tahap persiapan bahan baku, tahap sintesa LPG, dan tahap pemurnian produk LPG. Tahap persiapan bahan baku dilakukan dengan cara mengekstraksi aspal buton dengan pelarut benzena untuk memperoleh kandungan aspalten yang terdapat dalam batuan aspal buton. Selanjutnya, tahap sintesa LPG dilakukan dengan mereaksikan aspalten dengan gas hidrogen dengan proses catalytic hydrocracking. Hasil reaksi yang dihasilkan dari reaktor fixed bed berupa sisa H2, LPG, gasoline, diesel, coke, dan pengotor berupa CO2 dan H2S. Tahap pemurnian produk dilakukan dengan memisahkan kandungan CO2 dan H2S dalam LPG dengan menggunakan absorber. Produk samping yang dihasilkan dari pabrik LPG ini berupa gasoline dan diesel. Produk samping akan dipisahkan dengan menggunakan kolom distilasi. Produk samping akan dimanfaatkan sebagai bahan bakar pada furnace. Pabrik LPG ini memiliki jumlah pekerja sebanyak 312 pekerja dengan waktu operasi 24 jam selama setahun sehingga pekerja akan dibagi menjadi 3 shift dengan 8 jam kerja/shift. Pabrik LPG ini berdiri dengan luas tanah sebesar 47.670 m2. Adapun kebutuhan listrik yang dibutuhkan pabrik LPG sebesar 840.946 Hp dan kebutuhan air sebesar 1.033.486 liter/jam. Diperoleh jumlah modal investasi (TCI) sebesar $ 86.556.502, TCI terbagi menjadi 2 yaitu modal tetap (FCI) sebesar $ 75.266.523 dan modal kerja (WCI) sebesar $ 11.289.978. Berdasarkan aspek ekonomi teknik didapatkan nilai DCFR pabrik sebesar 16,04%, DPBP sebesar 11,602 tahun, NPV sebesar $ 85.184.485, ROI sebesar 47%, BEP sebesar 70%. Berdasarkan aspek tersebut dapat disimpulkan bahwa pabrik LPG ini layak untuk dikaji lebih lanjut.
Item Type: | Thesis (Bachelor) |
---|---|
Subjects: | T Technology > TP Chemical technology |
Divisions: | Jurusan Teknologi Industri dan Proses > Teknik Kimia |
Depositing User: | Gardinna Safa Fadila |
Date Deposited: | 18 Jul 2023 02:18 |
Last Modified: | 18 Jul 2023 02:18 |
URI: | http://repository.itk.ac.id/id/eprint/20017 |
Actions (login required)
View Item |