Rivani, Muhammad Fajar and Amanda, Fitri (2023) Pra-Rancangan Pabrik Bio-Naphtha Dari Refined Bleached Deodorized Palm Oil (RBDPO) Melalui Proses Hydroprocessing Dengan Kapasitas 2.000.000 Ton/Tahun. Bachelor thesis, Institut Teknologi Kalimantan.
Text
05191043_05191028_cover.pdf - Other Restricted to Repository staff only until 7 January 2025. Download (117kB) | Request a copy |
|
Text
05191043_05191028_statement_of_authenticity.pdf - Other Restricted to Repository staff only until 7 January 2025. Download (77kB) | Request a copy |
|
Text
05191043_05191028_publishing_agreement.pdf - Other Restricted to Repository staff only until 7 January 2025. Download (110kB) | Request a copy |
|
Text
05191043_05191028_approval_sheet.pdf - Other Restricted to Repository staff only until 7 January 2025. Download (82kB) | Request a copy |
|
Text
05191043_05191028_preface.pdf - Other Restricted to Repository staff only until 7 January 2025. Download (249kB) | Request a copy |
|
Text
05191043_05191028_abstract_id.pdf - Other Restricted to Repository staff only until 7 January 2025. Download (269kB) | Request a copy |
|
Text
05191043_05191028_abstract_en.pdf Restricted to Repository staff only until 7 January 2025. Download (269kB) | Request a copy |
|
Text
05191043_05191028_table_of_content.pdf Restricted to Repository staff only until 7 January 2025. Download (352kB) | Request a copy |
|
Text
05191043_05191028_illustrations.pdf Restricted to Repository staff only until 7 January 2025. Download (277kB) | Request a copy |
|
Text
05191043_05191028_tables.pdf Restricted to Repository staff only until 7 January 2025. Download (292kB) | Request a copy |
|
Text
05191043_05191028_chapter_1.pdf Restricted to Repository staff only until 7 January 2025. Download (777kB) | Request a copy |
|
Text
05191043_05191028_chapter_2.pdf Restricted to Repository staff only until 7 January 2025. Download (507kB) | Request a copy |
|
Text
05191043_05191028_chapter_3.pdf Restricted to Repository staff only until 7 January 2025. Download (935kB) | Request a copy |
|
Text
05191043_05191028_chapter_4.pdf Download (509kB) |
|
Text
05191043_05191028_chapter_5.pdf Restricted to Repository staff only until 7 January 2025. Download (412kB) | Request a copy |
|
Text
05191043_05191028_chapter_6.pdf Restricted to Repository staff only until 7 January 2025. Download (254kB) | Request a copy |
|
Text
05191043_05191028_chapter_7.pdf Restricted to Repository staff only until 7 January 2025. Download (613kB) | Request a copy |
|
Text
05191043_05191028_chapter_8.pdf Restricted to Repository staff only until 7 January 2025. Download (453kB) | Request a copy |
|
Text
05191043_05191028_conclusions.pdf Restricted to Repository staff only until 7 January 2025. Download (195kB) | Request a copy |
|
Text
05191043_05191028_bibliography.pdf - Bibliography Restricted to Repository staff only until 7 January 2025. Download (202kB) | Request a copy |
|
Text
05191043_05191028_enclosure.pdf Restricted to Repository staff only until 7 January 2025. Download (1MB) | Request a copy |
|
Text
05191043_05191028_presentation.pdf Restricted to Repository staff only until 7 January 2025. Download (2MB) | Request a copy |
|
Text
05191043_05191028_Form TA-020.pdf Restricted to Repository staff only until 7 January 2025. Download (263kB) | Request a copy |
Abstract
Pra rancangan pabrik bio-naphtha berbahan baku Refined Bleached Deodorized Palm Oil (RBDPO) memiliki kapasitas produksi 2.000.000 ton/tahun dan beroperasi secara kontinyu. Produksi bio-naphtha secara umum terbagi menjadi dua tahapan utama, yaitu proses hydrotreating dan hydrocracking. Proses hydrotreating pada reaktor 1 menggunakan katalis NiMoS2/γ-Al2O3 dengan konversi reaksi yang dihasilkan sebesar 99%, bertujuan untuk mengubah asam lemak bebas dan asam lemak jenuh pada RBDPO menjadi hidrokarbon rantai panjang berupa C15-C18. Proses hydrocracking pada reaktor 2 menggunakan katalis Pt/US-Y zeolite dengan konversi reaksi sebesar 93%, dimana senyawa hidrokarbon rantai C15-C18 direaksikan dengan gas hidrogen menjadi senyawa hidrokarbon rantai pendek (C7-C11). Hydrocracking merupakan pemutusan rantai karbon dengan penambahan hidrogen yang ditandai dengan konversi hidrokarbon rantai panjang menjadi produk hidrokarbon rantai pendek. Pabrik ini akan dibangun di wilayah Kawasan Industri Krakatau, Kota Cilegon, Provinsi Banten dengan luas lahan sebesar 15 hektare. Adapun kebutuhan energi untuk pengoperasian pabrik ini meliputi kebutuhan listrik sebesar 93.165 kW. Berdasarkan analisis ekonomi, pendirian pabrik bio-naphtha membutuhkan Total Capital Invesment (TCI) sebesar US$ 1.069.169.752 dan Total Production Cost (TPC) sebesar US$ 2.426.079.784. Pabrik bio-naphtha yang dirancang memiliki Return on Investment (ROI) sebesar 96%, Net Present Value (NPV) sebesar US$ 10.374.527.299, dan Discounted Cash Flow Rate of Return (DCFR) sebesar 45,15%. Berdasarkan parameter tersebut dapat disimpulkan bahwa pabrik bio-naphtha yang dirancang layak untuk dikaji lebih lanjut
Item Type: | Thesis (Bachelor) |
---|---|
Subjects: | Q Science > QD Chemistry T Technology > T Technology (General) T Technology > TP Chemical technology |
Divisions: | Jurusan Teknologi Industri dan Proses > Teknik Kimia |
Depositing User: | Muhammad Fajar Rivani |
Date Deposited: | 18 Jul 2023 02:55 |
Last Modified: | 18 Jul 2023 02:55 |
URI: | http://repository.itk.ac.id/id/eprint/20075 |
Actions (login required)
View Item |