PERENCANAAN ANGGARAN BIAYA,PENJADWALAN, DAN METODE PELAKSANAAN PADA PEMBANGUNAN KANTIN DI INSTITUT TEKNOLOGI KALIMANTAN

Simanjorang, Aquilera (2025) PERENCANAAN ANGGARAN BIAYA,PENJADWALAN, DAN METODE PELAKSANAAN PADA PEMBANGUNAN KANTIN DI INSTITUT TEKNOLOGI KALIMANTAN. Bachelor thesis, Institut Teknologi Kalimantan.

[img] Text
07211015_cover.pdf
Restricted to Repository staff only until 4 October 2027.

Download (362kB) | Request a copy
[img] Text
07211015_statement_of_authenticity.pdf
Restricted to Repository staff only until 4 October 2027.

Download (221kB) | Request a copy
[img] Text
07211015_publishing_agreement.pdf
Restricted to Repository staff only until 4 October 2027.

Download (424kB) | Request a copy
[img] Text
07211015_approval_sheet.pdf
Restricted to Repository staff only until 4 October 2027.

Download (265kB) | Request a copy
[img] Text
07211015_preface.pdf
Restricted to Repository staff only until 4 October 2027.

Download (437kB) | Request a copy
[img] Text
07211015_abstract_id.pdf
Restricted to Repository staff only until 4 October 2027.

Download (443kB) | Request a copy
[img] Text
07211015_abstract_en.pdf
Restricted to Repository staff only until 4 October 2027.

Download (443kB) | Request a copy
[img] Text
07211015_table_of_content.pdf
Restricted to Repository staff only until 4 October 2027.

Download (461kB) | Request a copy
[img] Text
07211015_illustrations.pdf
Restricted to Repository staff only until 4 October 2027.

Download (484kB) | Request a copy
[img] Text
07211015_tables.pdf
Restricted to Repository staff only until 4 October 2027.

Download (485kB) | Request a copy
[img] Text
07211015_capther_1.pdf
Restricted to Repository staff only until 4 October 2027.

Download (1MB) | Request a copy
[img] Text
07211015_capther_2.pdf
Restricted to Repository staff only until 4 October 2027.

Download (2MB) | Request a copy
[img] Text
07211015_capther_3.pdf
Restricted to Repository staff only until 4 October 2027.

Download (875kB) | Request a copy
[img] Text
07211015_capther_4.pdf
Restricted to Repository staff only until 4 October 2027.

Download (4MB) | Request a copy
[img] Text
07211015_conclusions.pdf
Restricted to Repository staff only until 4 October 2027.

Download (538kB) | Request a copy
[img] Text
07211015_bibliography.pdf
Restricted to Repository staff only until 4 October 2027.

Download (455kB) | Request a copy
[img] Text
07211015_enclosure.pdf
Restricted to Repository staff only until 4 October 2027.

Download (8MB) | Request a copy
[img] Text
07211015_paper.pdf
Restricted to Repository staff only until 4 October 2027.

Download (1MB) | Request a copy
[img] Text
07211015_presentation.pdf
Restricted to Repository staff only until 4 October 2027.

Download (714kB) | Request a copy
[img] Text
07211015_Form TA-020.pdf
Restricted to Repository staff only until 4 October 2027.

Download (516kB) | Request a copy

Abstract

Proyek pembangunan kantin dua lantai di Institut Teknologi Kalimantan ini akan menggunakan struktur utama beton bertulang yang dicor di tempat, didukung oleh suplai beton ready mix untuk memastikan kualitas dan efisiensi pengecoran. Pelaksanaan pekerjaan struktur dilakukan dengan metode bottom-up, dimulai dari pondasi hingga lantai teratas. Penyusunan Rencana Anggaran Biaya (RAB) proyek mengacu pada standar harga satuan Kota Balikpapan dan referensi brosur yang relevan, sesuai peraturan yang berlaku, untuk memastikan kesesuaian biaya pelaksanaan. Analisis biaya ini mencakup perhitungan kapasitas alat, produktivitas tenaga kerja, durasi pekerjaan, serta penyusunan detail setiap item pekerjaan secara cermat. Setelah durasi setiap item pekerjaan teridentifikasi, tahapan selanjutnya adalah penyusunan jadwal proyek secara terperinci dengan bantuan perangkat lunak Microsoft Project, yang akan mengidentifikasi hubungan antar tugas (predecessor dan successor) serta jalur kritis proyek. Dari perencanaan yang telah disusun, didapatkan waktu pelaksanaan proyek tersebut adalah 196 hari kalender kerja, terhitung mulai tanggal 01 Oktober 2025 hingga 17 Maret 2026. Hari kerja efektif proyek ditetapkan dari Senin hingga Sabtu, dengan jam kerja 7 jam per hari, dimulai pukul 08.00 hingga pukul 16.00. Adapun total biaya pelaksanaan untuk pembangunan kantin dua lantai ini diperkirakan sebesar Rp13.785.458,00.

Item Type: Thesis (Bachelor)
Subjects: A General Works > AC Collections. Series. Collected works
Divisions: Jurusan Teknik Sipil dan Perencanaan
Depositing User: Aquilera Simajorang
Date Deposited: 11 Jul 2025 02:51
Last Modified: 11 Jul 2025 02:51
URI: http://repository.itk.ac.id/id/eprint/23798

Actions (login required)

View Item View Item