Almutawaqqil, Rozan and Aliya, Sonia Wardatul (2025) Pra Rancangan Pabrik Paraldehyde dari Proses Polimerisasi Acetaldehyde. Bachelor thesis, Institut Teknologi Kalimantan.
![]() |
Text
05211079_05211081_cover.pdf Restricted to Repository staff only until 4 January 2027. Download (206kB) | Request a copy |
![]() |
Text
05211079_05211081_statement_of_authenticity.pdf Restricted to Repository staff only until 4 January 2027. Download (2MB) | Request a copy |
![]() |
Text
05211079_05211081_publishing_agreement.pdf Restricted to Repository staff only until 4 January 2027. Download (2MB) | Request a copy |
![]() |
Text
05211079_05211081_approval_sheet.pdf Restricted to Repository staff only until 4 January 2027. Download (2MB) | Request a copy |
![]() |
Text
05211079_05211081_preface.pdf Restricted to Repository staff only until 4 January 2027. Download (352kB) | Request a copy |
![]() |
Text
05211079_05211081_abstract_id.pdf Restricted to Repository staff only until 4 January 2027. Download (334kB) | Request a copy |
![]() |
Text
05211079_05211081_abstract_en.pdf Restricted to Repository staff only until 4 January 2027. Download (386kB) | Request a copy |
![]() |
Text
05211079_05211081_table_of_content.pdf Restricted to Repository staff only until 4 January 2027. Download (483kB) | Request a copy |
![]() |
Text
05211079_05211081_illustrations.pdf Restricted to Repository staff only until 4 January 2027. Download (392kB) | Request a copy |
![]() |
Text
05211079_05211081_tables.pdf Restricted to Repository staff only until 4 January 2027. Download (405kB) | Request a copy |
![]() |
Text
05211079_05211081_notations.pdf Restricted to Repository staff only until 4 January 2027. Download (343kB) | Request a copy |
![]() |
Text
05211079_05211081_chapter_1.pdf Restricted to Repository staff only until 4 January 2027. Download (1MB) | Request a copy |
![]() |
Text
05211079_05211081_chapter_2.pdf Restricted to Repository staff only until 4 January 2027. Download (712kB) | Request a copy |
![]() |
Text
05211079_05211081_chapter_3.pdf Restricted to Repository staff only until 4 January 2027. Download (688kB) | Request a copy |
![]() |
Text
05211079_05211081_chapter_4.pdf Restricted to Repository staff only until 4 January 2027. Download (1MB) | Request a copy |
![]() |
Text
05211079_05211081_chapter_5.pdf Restricted to Repository staff only until 4 January 2027. Download (469kB) | Request a copy |
![]() |
Text
05211079_05211081_chapter_6.pdf Restricted to Repository staff only until 4 January 2027. Download (753kB) | Request a copy |
![]() |
Text
05211079_05211081_chapter_7.pdf Restricted to Repository staff only until 4 January 2027. Download (1MB) | Request a copy |
![]() |
Text
05211079_05211081_chapter_8.pdf Restricted to Repository staff only until 4 January 2027. Download (563kB) | Request a copy |
![]() |
Text
05211079_05211081_conclusions.pdf Restricted to Repository staff only until 4 January 2027. Download (353kB) | Request a copy |
![]() |
Text
05211079_05211081_bibliography.pdf Restricted to Repository staff only until 4 January 2027. Download (413kB) | Request a copy |
![]() |
Text
05211079_05211081_enclosure.pdf Restricted to Repository staff only until 4 January 2027. Download (2MB) | Request a copy |
![]() |
Text
05211079_05211081_paper.pdf Restricted to Repository staff only until 4 January 2027. Download (370kB) | Request a copy |
![]() |
Text
05211079_05211081_presentation.pdf Restricted to Repository staff only until 4 January 2027. Download (2MB) | Request a copy |
![]() |
Text
05211079_05211081_Form. TA-020.pdf Restricted to Repository staff only until 4 January 2027. Download (320kB) | Request a copy |
Abstract
Produksi paraldehida dari proses polimerisasi asetaldehida melalui 3 tahapan proses yaitu, tahap pre-treatment asetaldehida, tahap reaksi polimerisasi, dan tahap separasi. Tahap pre-treatment dilakukan dengan menguapkan asetaldehida secara keseluruhan menjadi fase gas sebagai umpan mixing point lalu direaksikan kedalam reaktor. Selanjutnya, tahap reaksi polimerisasi dilakukan dengan mereaksikan asetaldehida dengan katalis amberlyst 15 konversi maksimum reaksi sebesar 92% pada reaktor fixed-bed multitube. Kemudian hasil reaksi dimasukkan ke dalam menara distilasi untuk memisahkan campuran asetaldehida, air, paraldehida serta melakukan recycle reaktan yang belum terkonversi sempurna. Produk bawah menara distilasi didinginkan untuk memperoleh paraldehida dengan pharmaceutical grade. Pabrik paraldehida memiliki jumlah pekerja sebanyak 126 dengan waktu operasional selama 24 jam dalam waktu setahun (330 hari) pembagian jam kerja mejadi 3 shift selama 8 jam/shift. Pabrik ini direncankan akan didirikan di Kawasan Industri Terpadu Batang, Jawa Tengah dengan luas tanah sebesar 43.358 m2. Pabrik paraldehida ini membutuhkan listrik sebesar 291,12 kW, kebutuhan steam sebesar 1.082,460 kg/jam, dan kebutuhan air sebesar 106.808,220 liter/jam. Adapun modal tetap (FCI) dan modal kerja (WCI) yang dibutuhkan dalam pembangunan pabrik ini sebesar $26.747.173,70 & $4.720.089,48 dengan jumlah modal investasi pabrik ini (TCI) sebesar $31.467.263,18. Aspek ekonomi terukur dari pabrik ini meliputi nilai DCFFR sebesar 26,59%, nilai ROI sebesar 89,52%, nilai SDP sebesar 5%, dan nilai BEP sebesar 56%. Berdasarkan aspek-aspek yang telah dijelaskan, dapat disimpulkan bahwa pabrik paraldehida dengan pharmaceutical grade ini layak untuk dikaji lebih lanjut. Kata Kunci: Acetaldehyde, Paraldehyde, Polimerisasi
Item Type: | Thesis (Bachelor) |
---|---|
Subjects: | T Technology > TP Chemical technology |
Divisions: | Jurusan Teknologi Industri dan Proses > Teknik Kimia |
Depositing User: | Rozan Almutawaqqil |
Date Deposited: | 11 Jul 2025 06:55 |
Last Modified: | 11 Jul 2025 06:55 |
URI: | http://repository.itk.ac.id/id/eprint/24384 |
Actions (login required)
![]() |
View Item |