Mardianti, Nofita (2026) Perencanaan Dinding Penahan Tanah Tipe Gravitasi Dan Geotekstil Sebagai Mitigasi Struktural Dan Identifikasi Mitigasi Non-Struktural Pada Lereng Longsor Di Somber, Kota Balikpapan. Bachelor thesis, Institut Teknologi Kalimantan.
|
Text
07221023_cover.pdf - Cover Image Restricted to Registered users only until 7 October 2028. Download (542kB) | Request a copy |
|
|
Text
07221023_abstract_id.pdf Restricted to Registered users only until 7 October 2028. Download (386kB) | Request a copy |
|
|
Text
07221023_abstract_id.pdf Restricted to Registered users only until 7 October 2028. Download (386kB) | Request a copy |
|
|
Text
07221023_abstract_en.pdf Restricted to Registered users only until 7 October 2028. Download (426kB) | Request a copy |
|
|
Text
07221023_table_of_content.pdf Restricted to Repository staff only until 7 October 2028. Download (492kB) | Request a copy |
|
|
Text
07221023_ilustrations.pdf Restricted to Repository staff only until 7 October 2028. Download (483kB) | Request a copy |
|
|
Text
07221023_tables.pdf Restricted to Repository staff only until 7 October 2028. Download (478kB) | Request a copy |
|
|
Text
07221023_notations.pdf Restricted to Repository staff only until 7 October 2028. Download (456kB) | Request a copy |
|
|
Text
07221023_chapter_1.pdf Restricted to Repository staff only until 7 October 2028. Download (717kB) | Request a copy |
|
|
Text
07221023_chapter_2.pdf Restricted to Repository staff only until 7 October 2028. Download (1MB) | Request a copy |
|
|
Text
07221023_chapter_3.pdf Restricted to Repository staff only until 7 October 2028. Download (839kB) | Request a copy |
|
|
Text
07221023_chapter_4.pdf Restricted to Repository staff only until 7 October 2028. Download (2MB) | Request a copy |
|
|
Text
07221023_conclusions.pdf Restricted to Repository staff only until 7 October 2028. Download (440kB) | Request a copy |
|
|
Text
07221023_bibliography.pdf - Bibliography Restricted to Registered users only until 7 October 2028. Download (406kB) | Request a copy |
|
|
Text
07221023_presentation.pdf Restricted to Repository staff only until 20 July 2028. Download (2MB) | Request a copy |
|
|
Text
07221023_Paper.pdf Restricted to Repository staff only until 20 July 2028. Download (499kB) | Request a copy |
|
|
Text
07221023_approval_sheet.pdf Restricted to Registered users only until 7 October 2028. Download (847kB) | Request a copy |
|
|
Text
07221023_approval_sheet.pdf Restricted to Registered users only until 7 October 2028. Download (293kB) | Request a copy |
|
|
Text
07221023_publishing_agreement.pdf Restricted to Registered users only until 7 October 2028. Download (323kB) | Request a copy |
|
|
Text
07221023_statment_of_authenticity.pdf Restricted to Registered users only until 7 October 2028. Download (250kB) | Request a copy |
|
|
Text
07221023_preface.pdf Restricted to Registered users only until 7 October 2028. Download (738kB) | Request a copy |
|
|
Text
07221023_enclosure.pdf Restricted to Repository staff only until 7 October 2028. Download (4MB) | Request a copy |
Abstract
Pada tanggal 31 Agustus 2025 terjadi longsor di kawasan Somber, Kota Balikpapan akibat keruntuhan dinding penahan tanah (DPT) eksisting sehingga diperlukan upaya mitigasi secara struktural dan non-struktural. Penelitian ini bertujuan merencanakan DPT tipe gravitasi dan geotekstil sesuai SNI 8460:2017, menghitung rencana anggaran biaya (RAB), serta mengidentifikasi mitigasi non-struktural berbasis komunitas. Metode penelitian meliputi pengujian parameter tanah, analisis stabilitas DPT secara manual terhadap geser, guling, dan daya dukung tanah, serta penyusunan RAB berdasarkan AHSP Kota Balikpapan Tahun 2025. Mitigasi non-struktural dianalisis melalui wawancara semi-terstruktur dengan pendekatan Miles dan Huberman yang meliputi reduksi data, penyajian data, dan penarikan kesimpulan. Hasil penelitian menunjukkan bahwa DPT gravitasi direncanakan dalam dua dua variasi ketinggian akibat kondisi eksisting, yaitu H =3,50 m dengan dimensi B = 1,75 m dan H= 4,50 m dengan dimensi B = 2,30 m, dengan nilai stabilitas berturut-turut Fgs = 5,37 dan 3,29; Fgl = 15,15 dan 9,5; dan SF daya dukung = 18,47 dan 15,4. DPT geotekstil direncanakan dengan H=3,00 m dan H= 4,00 m dengan panjang (L) berturut-turut 2,7m dan 3,3 m. Hasil perhitungan stabilitas eksternal berturut-turut Fgs = 29,21 dan12,81; Fgl =.150,41 dan 40,02, dan SF daya dukung tanah = 7,51 dan 6,31. Estimasi biaya pembangunan DPT gravitasi sebesar Rp276,743,509.39 dan DPT geotekstil sebesar Rp189,540,415.29 Hasil identifikasi mitigasi non-struktural berbasis komunitas menunjukkan bahwa di lokasi penelitian masih didominasi oleh upaya pascabencana dan belum ditemukan upaya prabencana seperti sistem peringatan dini, edukasi/sosialisasi, dan pelatihan kebencanaan
| Item Type: | Thesis (Bachelor) |
|---|---|
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Jurusan Teknik Sipil dan Perencanaan |
| Depositing User: | Nofita Mardianti |
| Date Deposited: | 16 Jul 2026 03:31 |
| Last Modified: | 16 Jul 2026 03:31 |
| URI: | http://repository.itk.ac.id/id/eprint/26222 |
Actions (login required)
![]() |
View Item |
