Kamil, Muhammad Saiid (2026) “PEMANFAATAN BELERANG (SULFUR) SEBAGAI CAMPURAN LASTON AC-BC (ASPHALT CONCRETE BINDER COURSE) DAN KAPUR PUTIH SEBAGAI FILLER”. Bachelor thesis, Insitut Teknologi Kalimantan.
|
Text
07211058_cover.pdf Restricted to Repository staff only until 4 October 2028. Download (641kB) | Request a copy |
|
|
Text
07211058_statement_of_authenticity.pdf Restricted to Repository staff only until 4 October 2028. Download (322kB) | Request a copy |
|
|
Text
07211058_Publishing_aggreement.pdf Restricted to Repository staff only until 4 October 2028. Download (322kB) | Request a copy |
|
|
Text
07211058_approval_sheet.pdf Restricted to Repository staff only until 4 October 2028. Download (444kB) | Request a copy |
|
|
Text
07211058_preface.pdf Restricted to Repository staff only until 4 October 2028. Download (227kB) | Request a copy |
|
|
Text
07211058_abstarct_id.pdf Restricted to Repository staff only until 4 October 2028. Download (243kB) | Request a copy |
|
|
Text
07211058_abstarct_en.pdf Restricted to Repository staff only until 4 October 2028. Download (242kB) | Request a copy |
|
|
Text
07211058_table_of_content.pdf Restricted to Repository staff only until 4 October 2028. Download (90kB) | Request a copy |
|
|
Text
07211058_illustrations.pdf Restricted to Repository staff only until 4 October 2028. Download (41kB) | Request a copy |
|
|
Text
07211058_tables.pdf Restricted to Repository staff only until 4 October 2028. Download (49kB) | Request a copy |
|
|
Text
07211058_chapter_1.pdf Restricted to Repository staff only until 4 October 2028. Download (328kB) | Request a copy |
|
|
Text
07211058_chapter_2.pdf Restricted to Repository staff only until 4 October 2028. Download (323kB) | Request a copy |
|
|
Text
07211058_chapter_3.pdf Restricted to Repository staff only until 4 October 2028. Download (646kB) | Request a copy |
|
|
Text
07211058_chapter_4.pdf Restricted to Repository staff only until 4 October 2028. Download (2MB) | Request a copy |
|
|
Text
07211058_chapter_5.pdf Restricted to Repository staff only until 4 October 2028. Download (31kB) | Request a copy |
|
|
Text
07211058_blibiography.pdf Restricted to Repository staff only until 4 October 2028. Download (266kB) | Request a copy |
|
|
Text
07211058_enclosure.pdf Restricted to Repository staff only until 4 October 2028. Download (1MB) | Request a copy |
|
|
Text
07211058_Form_TA-020.pdf Restricted to Repository staff only until 4 October 2028. Download (364kB) | Request a copy |
Abstract
The increasing demand for road construction has driven various efforts to improve the quality of road pavements, one of which is through the use of asphalt mixtures with additional materials with superior characteristics. One alternative material being studied is sulfur, which is insoluble in water and can improve the stability and flow of asphalt mixtures based on the Marshall test. This study aims to determine the optimum asphalt content (OAC), the optimum sulfur content, and to analyze the effect of sulfur and white lime filler additions on the characteristics of the Asphalt Concrete–Binder Course (AC-BC) mixture. The method used was the Marshall method based on the 2018 General Specifications for Highways, Revision 2. The sulfur content variations used were 3%, 6%, and 9%, with white lime filler variations of 1% and 2%. The results showed that the optimum asphalt content was 5.46%, with a stability value of 1,089 kg, flow of 2.66 mm, VIM of 3.22%, VMA of 14.89%, VFA of 78.34%, MQ of 408.47 kg/mm, and density of 2.26 g/cm³. Furthermore, the optimum sulfur content was obtained at 3% for both filler variations because all Marshall parameters met Highways specifications. With a 1% white lime filler, a 3% sulfur content resulted in a stability of 1,151.17 kg, a flow of 3.55 mm, a VIM of 3.98%, a VMA of 15.56%, a VFA of 74.37%, a MQ of 324.27 kg/mm, and a density of 2.24 g/cm³. Meanwhile, with a 2% white lime filler, the stability values were 1,122.23 kg, a flow of 3.30 mm, a VIM of 4.95%, a VMA of 16.56%, a VFA of 70.37%, a MQ of 340.07 kg/mm³, and a density of 2.26 g/cm³. The addition of 6% and 9% sulfur decreased the stability and Marshall Quotient values, as well as increased flow, resulting in some parameters not meeting specifications. Based on these results, the use of 3% sulfur with 1% or 2% white lime filler can be recommended as an alternative additive in AC-BC mixtures because it meets Marshall requirements and has the potential to support more sustainable use of volcanic waste.
| Item Type: | Thesis (Bachelor) |
|---|---|
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Depositing User: | Muhammad Saiid Insan Kamil |
| Date Deposited: | 20 Jul 2026 07:32 |
| Last Modified: | 20 Jul 2026 07:32 |
| URI: | http://repository.itk.ac.id/id/eprint/27904 |
Actions (login required)
![]() |
View Item |
