Naufal, Daffa Ahmad (2026) Perhitungan Durasi Pemasangan Block Kamar Mesin Ter Integrasi Dengan Sistem Perpipaan Bilge and Ballast. Bachelor thesis, Institut Teknologi Kalimantan.
|
Text
09221046_cover.pdf Download (521kB) |
|
|
Text
09221046_statement_of_authenticity.pdf Download (489kB) |
|
|
Text
09221046_publishing_agreement.pdf Download (329kB) |
|
|
Text
09221046_aprroval_sheet.pdf Download (272kB) |
|
|
Text
09221046_preface.pdf Download (144kB) |
|
|
Text
09221046_abstract_id.pdf Download (216kB) |
|
|
Text
09221046_abstract_en.pdf Restricted to Repository staff only until 4 October 2028. Download (233kB) | Request a copy |
|
|
Text
09221046_chapter_1.pdf Restricted to Repository staff only until 4 October 2028. Download (293kB) | Request a copy |
|
|
Text
09221046_chapter_2.pdf Restricted to Repository staff only until 4 October 2028. Download (570kB) | Request a copy |
|
|
Text
09221046_chapter_3.pdf Restricted to Repository staff only until 4 October 2028. Download (210kB) | Request a copy |
|
|
Text
09221046_chapter_4.pdf Restricted to Repository staff only until 4 October 2028. Download (2MB) | Request a copy |
|
|
Text
09221046_conclusions.pdf Restricted to Repository staff only until 4 October 2028. Download (204kB) | Request a copy |
|
|
Text
09221046_bibliography.pdf Download (204kB) |
|
|
Text
09221046_enclosure.pdf Restricted to Repository staff only until 4 October 2028. Download (289kB) | Request a copy |
|
|
Text
09221046_presentation.pdf Restricted to Repository staff only until 4 October 2028. Download (781kB) | Request a copy |
|
|
Text
09221046_table_of_content.pdf Restricted to Repository staff only until 4 October 2028. Download (171kB) | Request a copy |
|
|
Text
09221046_illustrations.pdf Restricted to Repository staff only until 4 October 2028. Download (89kB) | Request a copy |
|
|
Text
09221046_tables.pdf Restricted to Repository staff only until 4 October 2028. Download (84kB) | Request a copy |
|
|
Text
09221046_notations.pdf Restricted to Repository staff only until 4 October 2028. Download (106kB) | Request a copy |
|
|
Text
09221046_aprroval_sheet.pdf Download (330kB) |
|
|
Text
09221046_table_of_content.pdf Restricted to Repository staff only until 4 October 2028. Download (195kB) | Request a copy |
|
|
Text
09221046_illustrations.pdf Restricted to Repository staff only until 4 October 2028. Download (112kB) | Request a copy |
|
|
Text
09221046_tables.pdf Restricted to Repository staff only until 4 October 2028. Download (108kB) | Request a copy |
|
|
Text
09221046_notations.pdf Restricted to Repository staff only until 4 October 2028. Download (129kB) | Request a copy |
|
|
Text
09221046_paper.pdf Restricted to Repository staff only until 4 October 2028. Download (1MB) | Request a copy |
|
|
Text
09221046_paper.pdf Restricted to Repository staff only until 4 October 2028. Download (1MB) | Request a copy |
Abstract
Penelitian ini menganalisis durasi pemasangan block kamar mesin kapal tugboat yang terintegrasi dengan sistem perpipaan Bilge dan Ballast dan Pemadam Kebakaran serta Pelumasan menggunakan metode Critical Path Method (CPM) berbasis pendekatan Integrated Hull Construction, Outfitting and Painting (IHOP). Latar belakang masalah meliputi keterlambatan proyek galangan kapal akibat faktor seperti keterbatasan tenaga kerja, keterlambatan material, dan kurangnya koordinasi, yang diatasi melalui perencanaan waktu efisien untuk membandingkan metode konvensional dan terintegrasi. Metode penelitian mencakup studi literatur, pengumpulan data dari dokumen teknik seperti piping layout, Generral Arrangement, Frame section, dan Work Breakdown Structure (WBS), wawancara dengan tim galangan, serta analisis CPM pada Microsoft Project guna menunjang kebutuhan pada penelitian ini serta untuk mengidentifikasi jalur kritis dengan permodelan 3D kamar mesin mulai dari kamar mesin dengan perpipaan bilge and ballast. Hasil menunjukkan durasi awal 92,5 hari setelah menggunakan metode IHOP (Integrated Hull Outfitting and Painting) dan analisis Critical Path Method maka hasil durasi yang bisa mengurangi hari yaitu 65 hari sebesar 27,5 hari 29,73% dengan jalur kritis yaitu Fabrikasi Double Bottom, Fabrikasi Portside Shell, Fabrikasi Starboard Shell, Assembly Double Bottom dan Side Shell, Instalasi Engine Girder, Instalasi Main Engine, Instalasi Generator Set, Inspection. Aktivitas tersebut memiliki float 0 hari yang dimana tidak memiliki kelonggaran hari
| Item Type: | Thesis (Bachelor) |
|---|---|
| Subjects: | T Technology > TJ Mechanical engineering and machinery V Naval Science > V Naval Science (General) V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering |
| Divisions: | Jurusan Sains, Teknologi Pangan, dan Kemaritiman > Teknik Perkapalan |
| Depositing User: | Daffa Ahmad Naufal |
| Date Deposited: | 15 Jul 2026 06:00 |
| Last Modified: | 15 Jul 2026 06:00 |
| URI: | http://repository.itk.ac.id/id/eprint/26575 |
Actions (login required)
![]() |
View Item |
